My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-12-14_REVISION - C2010089 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2010089
>
2018-12-14_REVISION - C2010089 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2018 9:32:35 AM
Creation date
12/17/2018 6:40:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
Revision
Doc Date
12/14/2018
Doc Name
Application
From
Tri-State Generation and Transmission Association, Inc
To
DRMS
Type & Sequence
MR27
Email Name
BFB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRI-STATE GENERATION AND TRANSMISSION ASSOCIATION, INC. <br /> HEADQUARTERS: P.O. BOX 33695 DENVER, COLORADO 80233-0695 303-452-6111 <br /> December 12, 2018 <br /> Mr. Brock Bowles <br /> Environmental Protection Specialist <br /> Colorado Division of Reclamation, Mining and Safety RECEIVED <br /> 1313 Sherman Street, Room 215 <br /> Denver, CO 80203 DEC 14 Zola <br /> RE: New Horizon North Mine (Permit No. C-2010-089) Division of Reclamation, <br /> Minor Revision No. 27 (MR-27) Mining&Safety <br /> Section 2.05.4(2)(d) Overburden and Topsoil Handling Update <br /> Dear Mr. Bowles: <br /> Tri-State Generation and Transmission Association (Tri-State) is submitting the enclosed <br /> "Application Form for a Revision to a Coal Mining and Reclamation Permit" for a minor <br /> revision application on behalf of Elk Ridge Mining and Reclamation's (ERMR) New Horizon <br /> North Mine. Tri-State is the parent company of ERMR. The New Horizon North Mine operates <br /> under the Division of Reclamation, Mining and Safety(DRMS) Permit No. C-2010-089. <br /> MR-27 updates Section 2.05.4(2)(d) Overburden and Topsoil Handling to reflect the <br /> current topsoil and overburden stockpiles and topsoil redistribution plan. MR-27 also updates the <br /> permit boundary on Map 2.05.4(2)(d)-2 to reflect changes made in the TR-18 application. <br /> Also enclosed please find a revision application and a change of index sheet to ease <br /> incorporation of these materials in to the permit. If you have any questions about the enclosed <br /> technical revision, please contact Tony Tennyson at(970) 824-1232 or ttennyson(i)tristategt.org. <br /> Sincerely, <br /> Daniel J. Casi o <br /> Senior Manager <br /> Environmental Services <br /> DJC:JSS:der <br /> Enclosures <br /> cc: Frank Ferris (via email) <br /> Chris Gilbreath(via email) <br /> Jason Storey(via email) <br /> Tony Tennyson(via email) <br /> File: G474-11.3(21)c-5 <br /> AN EQUAL OPPORTUNITY/AFFIRMATIVE ACTION EMPLOYER CRAIG STATION ESCALANTE STATION NUCLA STATION <br /> P.O.BOX 7907 P.O.BOX Sn P.O.BOX 698 <br /> A Touchstone Energy'C'•ooperative CRAIG,CO 81626-1907 PREW r.NM 87046 NUCL&Co 8142440 <br /> 970424-M11 506-9 -sm 470.864-7916 <br />
The URL can be used to link to this page
Your browser does not support the video tag.