Laserfiche WebLink
West Elk Mine <br />Table of Contents (Continued) <br />Description of Mining Methods .................................... <br />2.05-169 <br />Preventative Measures ................................................... <br />2.05-169 <br />Anticipated Effects......................................................... <br />2.05-169 <br />Reduction Measures (Underground) ................ <br />2.08-170 <br />Preventive Measures (Surface) ......................... <br />2.05-170 <br />Detailed Description of Mitigating Measures..............2.05-170 <br />2.06.4 <br />Detailed Description of Measures to Determine <br />2.06-1 <br />Degree of Damage .................................................... <br />2.05-173 <br />Schedule of Submittal of Detailed Plan of <br />Underground Working............................................2.05-173 <br />2.06-1 <br />Protection of Hydrological Balance—2.05.6(3)(a-c).................... <br />2.05-174 <br />West Elk Mine Experience.................................................... <br />2.05-175 <br />Regional Mining Experience .................................................2.05-180 <br />Probable Hydrologic Consequences — 2.05.6 (3)(b)(iii & viii) 2.05-185 <br />Surface Water Quantity Effects.....................................2.05-186 <br />Bedrock Springs.............................................................. <br />2.05-205 <br />Reservoirs and Stock Ponds.................................2.05-206 <br />2.06.8 <br />Wetlands ..........................................................2.05 -207 <br />Water Rights .....................................................2.05-208 <br />Surface Water Quality Effects..............................2.05-228 <br />or Adjacent to Areas, Including Alluvial Valley Floors ................ <br />Summary of Surface Water Quality PHC's........................2.05-240 <br />Discharge of Sanitary Wastewater...................................2.05-242 <br />Groundwater Quantity Effects.......................................2.05-244 <br />Construction of Mine Entries.........................................2.05-246 <br />Subsidence Effects ......................................................2.05-247 <br />Groundwater Quality Effects.........................................2.05-289 <br />Surface Water.............................................................2.05-293 <br />Springs.....................................................................2.05-295 <br />Groundwater..............................................................2.05-296 <br />References for Rule 2.05 ................................................. <br />2.05-298 <br />2.06 Requirements for Permits for Special Categories of Mining ............................. <br />2.06-1 <br />2.06.1 <br />Scope.........................................................................................................2.06-1 <br />2.06.2 <br />Experimental Mining Practices............................................................. <br />2.06-1 <br />2.06.3 <br />Mountaintop Removal Mining............................................................... <br />2.06-1 <br />2.06.4 <br />Steep Slope Mining................................................................................. <br />2.06-1 <br />2.06.5 <br />Permits Incorporating Variances from Approximate Original <br />Contour Restoration Requirements for Steep Slope Mining........ <br />2.06-1 <br />2.06.6 <br />Prime Farmlands.................................................................................... <br />2.06-1 <br />2.06.7 <br />Variances for Delay in contemporaneous Reclamation <br />Requirements in Combined Surface and Underground <br />Mining Operations............................................................................ <br />2.06-2 <br />2.06.8 <br />Surface Coal mining and Reclamation Operations on Areas, <br />or Adjacent to Areas, Including Alluvial Valley Floors ................ <br />2.06-2 <br />Rev .03/06, 04/06 & 05/06- PRIO, 09/07 & 02/08- PR12, 04/09- TRIP; 08/09- TRIM, 08/09- TRI19, 01/10- TR120, 07/10- TR121; 08/18- <br />PR15 <br />