Laserfiche WebLink
Page 59 of 60 <br /> <br />CIRCES Cost Estimating Software <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: GRAND JUNCTION <br />Total one-way travel distance: 25.00 miles <br />Average Travel Speed: 50.00 mph <br /> <br />Total Non-Roadable Mob/Demob Cost * <br />‘* two round trips with haul rig: $4,333.98 <br />Total Roadable Mob/Demob Cost ** <br />** one round trip, no haul rig: $345.13 <br /> <br />Transportation Cycle Time: <br /> Non-Roadable <br />Equipment <br /> <br />Roadable <br />Equipment <br />Haul Time (Hours): 0.50 0.50 <br />Return Time (Hours): 0.50 0.50 <br />Loading Time (Hours): 0.50 NA <br />Unloading Time (Hours): 0.50 NA <br />Subtotals: 2.00 1.00 <br /> <br />JOB TIME AND COST <br /> <br /> Total job time: 4.00 Hours <br /> <br />Total job cost: <br /> <br />$4,679 <br /> <br />