Laserfiche WebLink
Page 48 of 60 <br /> <br />CIRCES Cost Estimating Software <br />Saltbush, Four Wing 2.00 2.75 $25.60 <br />Saltbush, Gardner 1.00 2.55 $11.65 <br />Globemallow, Scarlet (or copper) 0.50 5.66 $69.38 <br />Saltbush, Shadscale 1.00 1.49 $10.24 <br /> <br />Totals Seed Mix <br /> <br />17.85 <br /> <br />101.88 <br />$462.40 <br />Application <br /> <br />Description <br /> <br />Cost /Acre <br />Drill seeding (MEANS 32 92 19.13 0020) $439.00 <br /> <br />Total Seed Application Cost/Acre <br />$439.00 <br /> <br />MULCHING and MISCELLANEOUS <br />Materials <br /> <br />Description <br />Units / <br />Acre <br /> <br />Unit <br /> <br />Cost / Unit <br /> <br />Cost /Acre <br />Hay, delivered {MEANS 31 25 14.16 1200} 2.00 TON $288.00 $576.00 <br /> <br />Total Mulch Materials Cost/Acre <br /> <br /> <br /> <br /> <br /> <br /> <br />$576.00 <br />Application <br /> <br />Description <br /> <br />Cost /Acre <br />Crimping, with tractor {DMG survey data} $68.78 <br />Power mulcher (MEANS 32 91 13.16 0350) $92.78 <br /> <br />Total Mulch Application Cost/Acre <br />$161.56 <br /> <br />NURSERY STOCK PLANTING <br /> <br />Common Name <br />No / <br />Acre Type and Size Planting <br />Cost <br />Fertilizer <br />Pellet Cost <br /> <br />Cost /Acre <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />$ <br />Totals Nursery Stock Cost / Acre <br /> <br />$0.00 <br /> <br />JOB TIME AND COST <br />No. of Acres: 12.6 Cost /Acre: $1,792.47 <br />Estimated Failure Rate: 50% Cost /Acre*: $1,792.47 <br />*Selected Replanting Work Items: FERTILIZING,TILLING,SEEDING,MU <br />LCHING <br /> <br /> <br />Initial Job Cost: $22,585.12 <br />Reseeding Job Cost: $11,292.56 <br />Total Job Cost: $33,878 <br />Job Hours: 25.40 <br /> <br />