Laserfiche WebLink
Page 26 of 60 <br /> <br />CIRCES Cost Estimating Software <br /> <br />BULLDOZER WORK <br /> <br />Task description: Regrade Light-Use Road #2 <br />Site: Fruita Loadout Permit Action: RN1 Permit/Job#: C2010088 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 033 State: Colorado Abbreviation: None <br />Date: 8/23/2018 County: Mesa Filename: 031 <br />User: TNL <br />Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D9T - 9SU <br />Horsepower: 405 <br />Blade Type: Semi-Universal <br />Attachment: 1-shank ripper <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br /> Utilization % <br />Ownership Cost/Hour: $110.70 NA <br />Operating Cost/Hour: $95.46 100 <br />Ripper own. <br />Cost/Hour: $14.21 NA <br />Ripper op. Cost/Hour: $4.23 50 <br />Operator Cost/Hour: $40.23 NA <br />Total unit Cost/Hour: $264.83 <br />Total Fleet Cost/Hour: $264.83 <br /> <br />MATERIAL QUANTITIES <br />Initial Volume: 1,100 <br />Swell factor: 1.165 <br />Loose volume: 1,282 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety; Map 15 <br />Source of estimated swell <br />factor: <br />Cat Handbook <br /> <br />HOURLY PRODUCTION <br />Average push distance: 150 feet <br />Unadjusted hourly <br />production: <br />910.5 LCY/hr <br /> <br />Materials consistency <br />description: <br />Compacted fill or embankment 0.9 <br /> <br />Average push <br />gradient: <br />0 % <br />Average site altitude: 4,500 feet <br /> <br />Material weight: 2,900 lbs/LCY <br />