Laserfiche WebLink
Page 23 of 60 <br /> <br />CIRCES Cost Estimating Software <br /> <br />MOTOR GRADER WORK <br /> <br />Task description: Regrade Haul Road #2 <br />Site: Fruita Loadout Permit Action: RN1 Permit/Job#: C2010088 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 031 State: Colorado Abbreviation: None <br />Date: 8/23/2018 County: Mesa Filename: 031 <br />User: TNL <br />Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COST <br />Basic Machine: CAT 12M Horsepower: 158 <br />Ripper Attachment: Shift Basis: 1 per day <br /> Data Source: (CRG) <br />Cost Breakdown: <br /> Utilization % <br />Ownership Cost/Hour: $30.73 NA <br />Operating Cost/Hour: $30.60 100 <br />Ripper Ownership Cost/Hour: $0.00 NA <br />Ripper Operating Cost/Hour: $0.00 <br />Operator Cost/Hour: $45.64 NA <br />Total Unit Cost/Hour: $106.97 <br />Total Fleet Cost/Hour: $106.97 <br /> <br />MATERIAL QUANTITIES <br />Total Area to be graded or ripped: 0.88 acres <br />Source of estimated acreage: Map 15 <br /> <br />HOURLY PRODUCTION <br />Average Grader Speed: 1.50 mph <br />Selected Application: Finish grading (0-2.5 mph) - 1.5 <br />Selected Blade Angle: 30 degrees <br />Effective Blade Length: 10.40 feet <br />Width of blade overlap per pass: 2.00 feet <br />Net grading or ripping width per pass: 8.40 feet <br />Unadjusted Hourly Unit Production: 1.5273 acres/hour <br />Job Condition Correction Factors Site Altitude: 4500 feet <br /> Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.85 (1sh/d, mod.) <br />Net Correction: 0.8500 multiplier <br />Adjusted Hourly Unit Production: 1.2982 acres/Hour <br />Adjusted Hourly Fleet Production: 1.2982 acres/Hour <br /> <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) Total job time: 0.68 Hours <br />