Laserfiche WebLink
Page 17 of 60 <br /> <br />CIRCES Cost Estimating Software <br />Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />(min) <br />1 800.00 0.00 3.00 3.00 2824 0.387 <br />Haul Time: 0.387 minutes <br />Return Route: <br />Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />(min) <br />1 800.00 0.00 3.00 3.00 2874 0.307 <br />Return Time: 0.307 minutes <br />Total Truck Cycle Time: 3.378 minutes <br />Loading Tool unit <br />Production <br /> <br />314.89 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />261.36 <br /> <br />LCY/Hour <br />Truck Unit Production <br />175.62 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />145.77 <br /> <br />LCY/Hour <br /> <br />Optimal No. of Trucks: <br /> <br />2 <br /> <br />Truck(s) <br /> <br />Selected Number of Trucks: <br /> <br />3 <br /> <br />Truck(s) <br />Adjusted hourly truck team production: 437.30 LCY/Hour <br />Adjusted single truck/loader team production: 261.36 LCY/Hour <br />Adjusted multiple truck/loader team production: 261.36 LCY/Hour <br /> <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 8.80 Hours <br /> <br />Unit cost: <br /> <br />$2.879 <br /> <br />/LCY <br /> <br />Total job cost: <br /> <br />$6,621 <br /> <br />