Laserfiche WebLink
Page 11 of 60 <br /> <br />CIRCES Cost Estimating Software <br />Truck Travel (Haul & Return) Time: Road Condition: Firm, smooth, rolling, dirt/lt. surfaced, watered, <br />maintained 3.0 <br />Haul Route: <br />Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />(min) <br />1 1500.00 0.00 3.00 3.00 2824 0.635 <br />Haul Time: 0.635 minutes <br />Return Route: <br />Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />(min) <br />1 1500.00 0.00 3.00 3.00 2874 0.550 <br />Return Time: 0.550 minutes <br />Total Truck Cycle Time: 3.686 minutes <br />Loading Tool unit <br />Production <br /> <br />279.01 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />231.58 <br /> <br />LCY/Hour <br />Truck Unit Production <br />128.76 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />106.87 <br /> <br />LCY/Hour <br /> <br />Optimal No. of Trucks: <br /> <br />2 <br /> <br />Truck(s) <br /> <br />Selected Number of Trucks: <br /> <br />3 <br /> <br />Truck(s) <br />Adjusted hourly truck team production: 320.61 LCY/Hour <br />Adjusted single truck/loader team production: 231.58 LCY/Hour <br />Adjusted multiple truck/loader team production: 231.58 LCY/Hour <br /> <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 257.07 Hours <br /> <br />Unit cost: <br /> <br />$3.249 <br /> <br />/LCY <br /> <br />Total job cost: <br /> <br />$193,417 <br /> <br />