My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-12-12_GENERAL DOCUMENTS - C2010088
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C2010088
>
2018-12-12_GENERAL DOCUMENTS - C2010088
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2018 10:23:47 AM
Creation date
12/13/2018 10:22:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010088
IBM Index Class Name
General Documents
Doc Date
12/12/2018
Doc Name Note
For - RN1
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Brock Bowles
Permit Index Doc Type
Findings
Email Name
BFB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 9 of 60 <br /> <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br /> <br />Task description: Remove Fill from Rail Bed and Place on Facilities Area <br />Site: Fruita Loadout Permit Action: RN1 Permit/Job#: C2010088 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 003 State: Colorado Abbreviation: None <br />Date: 8/23/2018 County: Mesa Filename: 03 <br />User: TNL <br />Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COST Shift basis: 1 per day Equipment Description <br />Truck Loader Team -Truck: Generic 8-10 cy, 6x4 <br />-Loader: Cat 336D L 10’-6” Stick <br />Support Equipment -Load Area: NA <br />-Dump Area: Cat D9T - 9SU <br />Road Maintenance –Motor Grader: CAT 12M <br />-Water Truck: Water Tanker, 5,000 Gal. <br /> <br />Cost Breakdown: Truck/Loader Team Support Equipment Maintenance Equipment <br /> Truck Excavator Load Area Dump Area Motor <br />Grader <br />Water Truck <br />%Utilization-machine: 100 100 NA 100 50 100 <br />Ownership cost/hour: $15.87 $50.81 NA $110.70 $30.73 $25.30 <br />Operating cost/hour: $40.15 $57.53 NA $95.46 $15.30 $36.60 <br />%Utilization-riper: NA 0 NA NA NA NA <br />Ripper own. <br />cost/hour: NA $0.00 NA $0.00 $0.00 $0.00 <br />Ripper op. cost/hour: NA $0.00 NA $0.00 $0.00 $0.00 <br />Operator cost/hour: $0.00 $36.93 NA $40.23 $45.64 $39.10 <br />Unit Subtotals: $56.02 $145.28 NA $246.39 $91.67 $101.00 <br />Number of Units: 3 1 0 1 1 1 <br />Group Subtotals: Work: $313.34 Support: $246.39 Maint: $192.67 <br />Total work team cost/hour: $752.40 <br /> <br />MATERIAL QUANTITIES <br />Initial volume: 51,100 CCY Swell factor: 1.165 <br />Loose volume: 59,532 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety; Map 21 <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br /> <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br /> Material weight: 2,900 Pounds/LCY <br /> Description: Decomposed rock - 50% Rock, 50% Earth
The URL can be used to link to this page
Your browser does not support the video tag.