Laserfiche WebLink
Page 1 of 60 <br /> <br />CIRCES Cost Estimating Software <br />COST SUMMARY WORK <br /> <br />Task description: Permit Renewal No.1 <br />Site: Fruita Loadout Permit Action: RN1 Permit/Job#: C2010088 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado Abbreviation: None <br />Date: 8/13/2018 County: Mesa Filename: C088-000 <br />User: TNL <br />Agency or organization name: DRMS <br /> <br />TASK LIST (DIRECT COSTS) <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br /> <br />Cost <br />001 Remove Fill from Haul Road #1 and Place on <br />Facilities Area <br />TRUCK1 1 20.35 $15,312.00 <br />002 Remove Fill from Haul Road #2 and Place on <br />Facilities Area <br />TRUCK1 1 13.58 $10,220.00 <br />003 Remove Fill from Rail Bed and Place on Facilities <br />Area <br />TRUCK1 1 257.07 $193,417.00 <br />004 Remove Material from Fill Pile and Place on <br />Facilities Area <br />TRUCK1 1 69.34 $52,170.00 <br />005 Remove Coal Fines from Stockpile and Place in <br />Fill <br />TRUCK1 1 8.80 $6,621.00 <br />015 Compact Backfilled and Regraded Surfaces COMPACT 1 74.72 $11,477.00 <br />020 Rip Regraded Surfaces Prior to Topsoil <br />Replacement <br />RIPPER 1 22.86 $6,152.00 <br />021 Rip Haul Road #1, #2 and Access Road RIPPER 1 6.13 $1,650.00 <br />030 Regrade Haul Road #1 GRADER 1 1.92 $206.00 <br />031 Regrade Haul Road #2 GRADER 1 0.67 $73.00 <br />032 Regrade Access Road GRADER 1 0.30 $33.00 <br />033 Regrade Light-Use Road #2 DOZER 1 3.17 $839.00 <br />040 Finish Grade Disturbed Areas Prior to Seeding GRADER 1 16.56 $1,772.00 <br />045 Regrade Pond 1 DOZER 1 21.09 $5,586.00 <br />046 Regrade Pond 2 DOZER 1 21.09 $5,586.00 <br />047 Regrade Pond 3 DOZER 1 21.09 $5,586.00 <br />048 Remove Fill from Reed Wash Bridge Area to <br />Facilities Area <br />TRUCK1 1 14.73 $11,080.00 <br />049 Reconstruct Reed Wash at Rail Bridge NA 1 121.22 $47,708.82 <br />050 Regrade Ditches DOZER 1 5.27 $1,396.00 <br />055 Replace Topsoil from Stockpile 1 to Light-Use <br />Road and Rail <br />TRUCK1 1 22.06 $16,596.00 <br />056 Replace Topsoil from Stockpile 2 to Rail Loop TRUCK1 1 27.11 $20,399.00 <br />060 Seed All Mine Areas Where Topsoil Was Replaced REVEGE 1 25.40 $33,878.00 <br />061 Hydroseed Reconstructed Reed Wash Bridge Area REVEGE 1 4.00 $10,001.00 <br />063 Weed Control - Spray Area 3 Times During <br />Liability Period <br />REVEGE 1 102.30 $7,490.00 <br />065 Demolish and Remove All Structures DEMOLISH 1 400.00 $282,102.82 <br />070 Site Maintenance, Rill and Gully Repair and SAE <br />Repair <br />SITEMAINT <br />ENANCE <br />1 168.00 $46,391.52 <br />075 Mobilize/Demobilize Equipment for Initial <br />Reclamation <br />MOBILIZE 1 4.00 $4,679.00