Laserfiche WebLink
Tabetha Lynch, DRMS <br />Page 3 <br />12/11/2018 <br /> <br />Trapper Response to Comment 6A: New permit narrative pages 2-462n, 2- 520xx, 2- 523z and <br />2-524h are enclosed to address the ground water issues outlined above specific to proposed N <br />Pit. Table of Contents page i-5 is revised and enclosed to reference these new pages. <br /> <br />DRMS December 2018 Response: The additional pages have been reviewed and meet the rule <br />requirements, not additional adequacy items are requested at this time. <br /> <br /> <br />Rule: 2.05.4(2)(f)(along with 4.05.8, 4.11.4, and 4.14.3) and (2)(g) – Reclamation Plan <br />No adequacy items <br /> <br />Rule: 2.05.6(3)(a)-(b) – Mitigation of Impacts of Mining <br />See adequacy item listed under Rule 2.04.7 <br /> <br /> <br />