My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-11-19_PERMIT FILE - C2010089A (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2010089
>
2018-11-19_PERMIT FILE - C2010089A (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2019 7:52:22 AM
Creation date
12/12/2018 8:48:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089A
IBM Index Class Name
Permit File
Doc Date
11/19/2018
Doc Name
Determination of Bond Amount
Section_Exhibit Name
Section 3.02.2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Determination of Bond Amount - Reclamation Cost Estimate (RCE) <br />The attached RCE represents worst case scenario for the current permit term. The reclamation <br />costs included herein were generated during the RN -01 application review for the current permit <br />term. Since the RCE for RN -01 was generated, New Horizon North has received approval for <br />TR -16 which resulted in a decrease to the total reclamation liability. All RCE documents are <br />contained herein to document the total required reclamation liability for the current permit term. <br />Reclamation Cost Estimate Summary <br />Permit Action Change in Bond Amount Total Bond Amount <br />RN -01 N/A $5,497,416.51 <br />TR -16 ($654,395.50) $4,843,021.01 <br />Current Total Liability ($654,395.50) $4,843,021.01 <br />Determination of Bond Amount - Cumulative Bond Schedule <br />In accordance with Rules 3.02.1(5)(b) and 3.02.1(6), New Horizon North (NHN) presents a <br />cumulative bond schedule for the reclamation of the NHN Mine including Final Pit, Facilities <br />Area, Overburden Stockpile, 2nd Park Lateral Ditch, West Haul Road, South Access Road, Pond <br />NHN-001 and ditches, Pond NHN-002 and ditches and Topsoil Stockpiles. <br />Final Pit <br />Activity <br />Reclamation Timm <br />Backfill Final Pit with Overburden Stockpile <br />2017-2019 <br />Finish Grade Final Pit <br />2017-2019 <br />Replace Topsoil on Final Pit <br />2017-2019 <br />Revegetate Final Pit <br />2017-2019 <br />Facilities Area <br />Activity Reclamation Timing <br />Re ade/Finish Grade Facilities Area 2017-2019 <br />Replace Topsoil on Facilities Area 2017-2019 <br />Reve etate Facilities Area 2017-2019 <br />Overburden Stockpile <br />Activity <br />Reclamation Timing <br />Re ade/Finish Grade Overburden Stockpile Area <br />2017-2019 <br />Replace Topsoil on Overburden Stockpile Area <br />2017-2019 <br />Reve etate Overburden Stockpile Area <br />2017-2019 <br />Section 3.02.2 Page 1 October 2018 (TR -18) <br />
The URL can be used to link to this page
Your browser does not support the video tag.