Laserfiche WebLink
Scraper Topsoil Placement <br />TOPSOIL PLACEMENT -SCRAPERS <br />Talpac <br />Production <br />Simulation <br />Haulage System: Scrapers Worst Case 2013 <br />Haul Cycle: l'PRJJ E94-2 <br />Material: fPRJ7 TQPsW <br />Roster: [PRJI 5 day Week - S Hour Shifts <br />Availability <br />% <br />85.00 <br />Bucket Fill Factor <br />0.80 <br />Average Bucket Load Volume <br />cu.yards <br />27.14 <br />Average Payload <br />bcy <br />18.85 <br />Operating Hours per Year <br />OpHrNear <br />11098.00 Op. hm feotored by availability <br />Average Operating Shifts per Year <br />shifts/Yeer <br />157.00 Shifts factored by availabUity <br />Average Bucket Cycle Time <br />min <br />1.70 <br />Loaded Transport Time <br />min <br />1,04 <br />Unloaded Transport Time <br />min <br />0.24 <br />Total Loading unit Cycle Time <br />min <br />1.49 <br />Transport Distance (One Way) <br />feet <br />705.00 <br />Production per Operating Hour <br />bey <br />207.31 <br />Production per Loader Operating Shift <br />bey <br />1,451 Max, prod, based on 100% avail. <br />Production per Year <br />bw <br />227,831 A3U moductim factored by "I. <br />Production per Year <br />bcyNear <br />227,831 <br />Discounted Capital Cost <br />$/bcy <br />0.00 Loading Methodology <br />Discounted Operating Cost <br />S/bcy <br />0.00 Single Sided <br />Discounted Average Cost <br />$/bey <br />0.00 Full Truck <br />Excavation Target <br />bcy <br />1,200.00 Average for 150 Shifts <br />Time to move Excavation Target <br />Days <br />1.92 <br />Loader Hrs to move Target <br />Op. Hours. <br />6 <br />Total Truck Hrs to move Target <br />Op. Hours. <br />6 <br />Total cost to move Target <br />$ <br />0 <br />Productivity estimates allow for insufficient time at the end of the shift to complete another cycle. <br />Time for the first bucket pass coincides with the truck queuing and maneuvering times. <br />This simulation is based on data provided by the equipment manufacturer. <br />Equipment data should be checked to ensure it is valid for this site. <br />Prepared by:.Tim Cummins <br />Prepared for..PR7_ Worst Case Bond Calculations <br />.Trapper Mining Inc. <br />5 -Apr -201312:36 PM Page 1 <br />