Laserfiche WebLink
Scraper Tops," PlacpaRent <br />TOPSOIL PLACEMENT SCRAPERS <br />Haulage System: Scrapers Worst Case 2073 <br />Haul Cycle. [PRJJ CG -I <br />'R./ <br />]5da Week- 8 He <br />Availability <br />- o �, <br />85.00 <br />Bucket Fill Factor <br />Average Bucket Load Volume <br />cu.yaros <br />0.80 <br />Average Payload <br />bcy <br />27.14 <br />18.85 <br />Operating Hours per Year <br />OpHr/Year <br />1.099.00 <br />Average Operating Shifts per Year <br />shifts/Year <br />157.00 <br />Average Bucket Cycle Time <br />min <br />Loaded Transport Time <br />1.70 <br />Unloaded Transport Time <br />min <br />1.01 <br />Total Loading unit Cycle Time <br />min <br />1,22 <br />Transport Distance (One Way) <br />min <br />feet <br />2.43 <br />Production per Operating Hour <br />bey <br />2,053.00 <br />Production per Loader Operating Shift <br />bcy <br />185.77 <br />Froduction par Year <br />bev <br />1,300 <br />204 1 Rn <br />Production per Year <br />bcy/Year <br />204,160 <br />Discounted Capital Cost <br />$/bey <br />0.00 <br />Discounted Operating Cost <br />$/bey <br />Discounted Average Cost <br />$/bey <br />0.00 <br />Excavation Target <br />Time to move Excavation Target <br />bcy <br />0.00 <br />11,810.00 <br />Loader Hrs to move Target <br />Days <br />Op. Hours. <br />21.31 <br />Total Truck Hrs to move Target <br />Op. Hour;. <br />64 <br />Total cost to move Target <br />$ <br />64 <br />0 <br />OP. hrs factored by availability <br />Shifts factored by availability <br />MOX Prod. based on 100% avail. <br />Loading Nethodo/cgy <br />Single Sided <br />Full Truck <br />Average for 150 Shifts <br />Productivity estimates allow for insufficient time at the end of the shift to complete another cycle. <br />Time for the first bucket pass coincides with the truck queuing and maneuvering times. <br />This simulation Is based on data provided by the equipment manufacturer. <br />Equipment data should be checked to ensure it is valid for this site. <br />Talpac <br />'repared by: -Tim Cummins <br />*2repared for..PR7 Worst Case Bond Calculations *Trapper Mining Inc. <br />5 -Apr -201312:21 PM Page 1 <br />