Laserfiche WebLink
Scraper Topsoil Pwanew <br />TOPSOIL PLACEMENT SCRAPERS <br />Heulege System: Scrapers Worst Case 2013 <br />Haul Cycle: [PRJr ASHI <br />PRJ - k - 8 Ho <br />Availability <br />% <br />Bucket Fill Factor <br />85.00 <br />Average Bucket Load Volume <br />0.80 <br />Average Payload <br />cu <br />bey <br />27.14 <br />Operating Hours per Year <br />O pHr/Year <br />18.85 <br />Average Operating Shifts per Year <br />shiftsNear <br />1,099.00 <br />Average Bucket Cycle Time <br />157.00 <br />Loaded Transport Time <br />min <br />1 70 <br />Unloaded Tran sport Time <br />min <br />1.05 <br />Total Loading unit Cycle Time <br />min <br />2 34 <br />Transport Distance (One Way) <br />min <br />3.50 <br />Production per Operating Hour <br />feet <br />3'153'46 <br />Production per Loader Operating Shin <br />ey <br />153.46 <br />Production Year <br />bcY <br />bcv <br />1,074 <br />168 654 <br />Production Per Year <br />Discounted Capital Cost <br />15CYNear <br />168,654 <br />Discounted Operating Coat <br />i/bcy <br />g/�y <br />0.00 <br />Discounted Average0.00 <br />Cost <br />$/bey <br />Excavation Target <br />bcy <br />0.00 <br />Time to move Excavation Target <br />97,092.00 <br />Loader Hrs to move Target <br />Days <br />Op. Hours. <br />p <br />210.27 <br />Total Truck Hrs to move Target <br />Op Hour <br />633 <br />Total cost to move Target <br />633 <br />Op. hra factored by avaasbillty <br />Shifts factmw by ovailability <br />May- prod. based on 100% avail. <br />Loading Methodology <br />Single Sided <br />Full Truck <br />Average for 150 Shifts <br />Productivity estimates allow for insufficient time at the end of the shift to complete another cycle. <br />Time for the first bucket pass coincides with the truck queuing and maneuvering times. <br />This simulation is based on data provided by the equipment manufacturer. <br />Equipment data should be checked to ensure it Is valid for this site. <br />HroPared by: Tim Cummins <br />Prepared for:.PR7 Worst Case Bond Calculations <br />Taipac <br />•Trapper Mining Inc. <br />5 -Apr -201312:18 PM Page 1 <br />