Laserfiche WebLink
NORTHWEST COLORADO CONSULTANTS, INC. <br />FIELD REPORT <br />Project: Collom Haul Road & Project No.: 17-10686 Date: 4/17/17 <br />Pipeline Time: 10.0 <br />Location: Rio Blanco County Report No.: 6 Mileage: 134 <br />Client: Wollam Construcion Engr. /Tech: RE <br />Work Performed: <br />As requested, we visited the project site on today's date and conducted compaction test No 's 8 through 12 on the <br />material being placed for the temporary facilities pond embankment fill <br />The excavation contractor, Precision Excavating, placed, moistened and compacted on-site material for the <br />embankment fill. <br />We obtained a sample of the material being placed today and returned it to our laboratory for standard Proctor <br />with classification testing. This will be determined as Proctor No. 5 (P5), for this project. <br />Remarks: <br />The materials tested generally met the project specifications for compaction. <br />Please refer to the attached sheet for results of today's testing <br />Verbal Discussions: <br />Tommy Sirk of Precision was notified of today's test results. <br />