Laserfiche WebLink
NORTHWEST COLORADO CONSULTANTS, INC. <br />FIELD REPORT <br />Project: Coelom Haul Road & Project No.: 17-10686 Date: 4/19/17 <br />Pipeline Time: 10 5 <br />Location: Rio Blanco County Report No.: 8 Mileage: 134 <br />Client: Wollam Construcion Engr. /Tech: RE <br />Work Performed: <br />As requested we visited the project site on today's date and conducted compaction test No 's 17 through 20 on <br />the material being placed for the temporary facilities pond embankment fill along with the construction access <br />road (CAR) excavation fill <br />The excavation contractor. Precision Excavating, placed moisture conditioned, and compacted on-site materials <br />for the pond embankment and topsoil over excavation, along the CAR between Station 4+50 and Station 6+00 <br />Prior to placement of fill materials along the CAR we observed the crew scarify and recompact the subgrade <br />Remarks: <br />The materials tested generally met the project specifications for compaction <br />Please refer to the attached sheet for results of today's testing <br />Verbal Discussions: <br />Tommy Sirk of Precision Excavating was notified of today's test results <br />