Laserfiche WebLink
LIST OF EXHIBITS <br />Volume 18C <br />Exhibit 7, Item 23 Sediment Control Plan Parts J — M <br />Exhibit 7, Item 25 <br />Collom Post Mine Channel Design <br />Exhibit 7, Item 25A <br />Collom In Pit Drilling Small Area Exemption <br />Exhibit 7, Item 25B <br />Collom Topsoil Depth Testing Small Area Exemption <br />Exhibit 7, Item 25C <br />Temporary Access Road Small Area Exemption <br />Exhibit 7, Item 25D <br />Power Line Light -Use Road Small Area Exemption <br />Volume 18D <br />Exhibit 7, Item 26 Collom Pond As-Builts <br />Volume 19 <br />Exhibit 9, Item 8 Baseline Survey of Soil Resources Collom Mining Area, Tetra Tech, July 2006 <br />Exhibit 9, Item 9 Prime Farmland Determination Documentation <br />Volume 20 <br />Exhibit 10, Item 6 Proposed Collom Coal Mine Project Baseline Vegetation Survey, May 2006, <br />Cedar Creek Associates, Inc. <br />Exhibit 10, Item 7 Wetlands and Waters of the US Delineation for Collom Project, May 2006, <br />Cedar Creek Associates, Inc. <br />Exhibit 11, Item 1 Wildlife Survey Report for the Collom Permit Study Area, August 25, 2006, <br />Cedar Creek Associates, Inc. <br />Exhibit 11, Item 2 2007 Wildlife Monitoring Report for the Collom Permit Study Area, <br />December 20, 2007, Cedar Creek Associates, Inc. <br />Exhibit 13C Cumulative Bond ScheduleExhibit 14, Item 7 Pre -Blast Survey — Structures <br />within '/z Mile of Collom Mining Area <br />(Pending) <br />Exhibit 14, Item 8 Pre -Blast Survey — Offering Letters (Pending) <br />Pre -Blast Structure Locations Drawing (Pending) <br />Exhibit 23, Item I Geotechnical Report — Collom Temporary Spoil Pile and Pond <br />Exhibit 23, Item 2 Addendum to Geotehcnial Study for the Collom Temporary Spoil Pile <br />ix Revision Date: 8/29/18 <br />Revision No.: TR -126 <br />