My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-12-10_PERMIT FILE - P2018017
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2018017
>
2018-12-10_PERMIT FILE - P2018017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 1:07:08 PM
Creation date
12/10/2018 4:45:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2018017
IBM Index Class Name
PERMIT FILE
Doc Date
12/10/2018
Doc Name
Application
From
John Reams
To
DRMS
Email Name
LJW
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Describe the method for seed bed preparation, and application method for <br /> grass/forb seeding: <br /> The area to be seeded will be scarified and the seed will be hand broadcast. <br /> V. TERMS AND CONDITIONS FOR PROSPECTING OPERATIONS: <br /> 1. Reclamation measures shall be fulfilled in a timely manner and completed within five <br /> (5) years of completion of prospecting activities. <br /> 2. The prospecting operations described in this Notice will be conducted in such a <br /> manner as to minimize surface disturbances. In addition to the measures required in <br /> Rule 5, precautions to be taken include: <br /> A. Confinement of operations to areas near existing roads or trails, where <br /> practicable. Existing roads which are to remain as permanent roads after <br /> prospecting activities are completed shall be left in a condition equal to or better <br /> than the pre-prospecting condition; <br /> B. Drilling shall be conducted in such a way as to prevent cuttings and fluids from <br /> directly entering any dry or flowing stream channel. Drill cuttings must be spread <br /> to a depth no greater than one-half(1/2) inch or buried in an approved disposal <br /> pit; <br /> C. Proper and timely abandonment of drill holes upon completion of drilling; <br /> D. Reclamation of affected lands upon completion of operations or phases of an <br /> operation;, <br /> E. Backfilling and revegetating any pits to blend in with the surrounding land <br /> surface; <br /> Form 2—Public File Page 11 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.