Laserfiche WebLink
diverted from the existing surge tank to the existing leach tanks, and the second will divert <br /> process solution from the existing leach tanks back to the "2020 Press Surge Tank". A diagram <br /> of this proposed process flow is included in Figure 2. The existing piping from the leach tanks to <br /> the leach circuit will remain to allow the flexibility to utilize them if necessary. Pending DRMS <br /> approval,both of the proposed pipe lines will be within the HGM and existing containment. <br /> A Material Safety Data Sheet for the HGM process solution to be conveyed and stored in the <br /> proposed modification is included with this submittal, Attachment 1. <br /> Other Permits and Licenses: <br /> No other permits or licenses are required to construct the proposed modifications. A No Impact <br /> TR will be filed with Teller County. <br /> Implementation Schedule: <br /> Pending DRMS approval and recommendations of said modifications, CC&V will begin <br /> construction immediately. <br /> Financial Warranty: <br /> CC&V has determined the guidelines presented within this TR will not affect the financial <br /> warranty. <br /> Enclosed please find check no. 200038660 in the amount of$1,006.00 for the technical revision <br /> fee. Should you require further information please do not hesitate to contact Katie Blake via <br /> phone or email at 719.689.4048, and Katie.BlakeLwnewmont.com, or me at 719.689.4042, and <br /> Justin.Rag]in(enewmont.com. <br /> Sincerely, <br /> F( - <br /> Justin Ragli <br /> Senior Environmental Manager <br /> Cripple Creek & Victor Gold Mining Co <br /> JR/kb <br /> Ec: T. Cazier—DRMS <br />