My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-12-03_REVISION - C1981035
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981035
>
2018-12-03_REVISION - C1981035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2018 7:13:46 AM
Creation date
12/4/2018 6:35:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
Revision
Doc Date
12/3/2018
Doc Name
Application
From
GCC Energy, LLC
To
DRMS
Type & Sequence
TR27
Email Name
BFB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GCC GCC Energy, LLC <br />Telephone: 970.385.4528 6473 County Road 120 <br />f n e r g y"Safety as a Value" Facsimile: 970.385 4638 Hesperus, CO 81326 <br />November 28, 2018 <br />State of Colorado RECEIVED <br />Division of Reclamation, Mining & Safety <br />1313 Sherman St., Room 215 0 3 2018 <br />Denver, CO 80203 <br />DIVISION OF RECLAMATION, <br />Attn: Brock Bowles, Environmental Protection Specialist MINING AND SAFETY <br />Re: GCC Energy, LLC, King II Mine <br />CDRMS Permit # C-1981-035 <br />Technical Revision No. 27 (TR -27) Initial Submittal <br />• Reconfigure Parts of the Existing, Permitted Refuse Pile <br />Mr. Bowles: <br />Please find attached Technical Revision TR -27, "Reconfigure Parts of the Existing, <br />Permitted Refuse Pile". <br />This reconfiguration expands the lower footprint of the existing Refuse Pile, while re - <br />contouring some of the original, existing original "pre -law" highwalls. Designs by <br />Stoner Engineering & Surveying are submitted as Appendix 10(4) and geotechnical <br />studies by Trautner Geotech LLC are submitted as Appendix 10(4A). <br />This change may require small additional surface disturbance and change of <br />reclamation bond amounts. The changes are shown on attached maps King I-007 (TR - <br />27), Operation Plan 8, Surface Features King I -007A (TR -27), Road Design Detail 8s <br />King I-011 (TR -27), Final Contour Map. Final engineer certifications will be provided <br />following initial review by the Division. <br />Please find enclosed: <br />• Technical Revision TR -27 Application Form <br />• Technical Revision TR -27 Proposed Public Notice <br />• King I PAP Cover Page <br />• King II Table of Contents pages iii & iv <br />• King II Section 2.03.8 page 1 <br />• King I Section 2.05.3 page 2A <br />• Appendix 10(4) Engineering Report by Stoner Engineering & Surveying <br />• Appendix 10(4A) Geotechnical Report by Trautner Geotech LLC <br />• Map King I-007 (TR -27) Operation Plan 8; Surface Features <br />• King I -007A (TR -27), Road Design Detail <br />• King I-011 (TR -27), Final Contour Map <br />
The URL can be used to link to this page
Your browser does not support the video tag.