Laserfiche WebLink
Zymin Corporation —AdcquacN Review M-2018-036 <br /> October 13. 2018 <br /> Page 3 of 3 <br /> 13. Within Exhibit C,under the heading 6.3.3(l)(g),the Applicant discusses the construction of an access trail <br /> (60'L x 18'W).Please clarify if the top 6 inches will be salvaged from the access road and will be replaced <br /> during reclamation. <br /> EXHIBIT D-Reclamation Plan(Rule 6.3.4) <br /> 14. As required by Rule 6.3.4(1)(c)(ii),please explain how the seedbed will be prepared after topsoil has been <br /> replaced. <br /> 15. The seed mixture provided in Exhibit D identifies nine species with a percent of each in the mixture and a <br /> statement that the mixture will be broadcast seeded at 20 lbs./acre.As required by Rule 6.3.4(l)(cxiii), <br /> please state seeding rate for each grass as pounds of pure live seed per acre(PLS/acre). <br /> EXHIBIT I-Proof of Filina with County Clerk(Rule 6.3.9) <br /> 16. Any changes or additions to the application on file with the Division,must also be reflected in the public <br /> review copy.Please submit proof that the public review copy has been updated or a copy of the response <br /> to this adequacy letter has been added to it. <br /> EXHIBIT L-Permanent Man-Made Structures(Rule 6.3.12) <br /> 17. USFS Road 201 appears to be within 200 feet of the proposed permit boundary.As required by Rule 6.3.12, <br /> please submit a structure agreement executed between the Applicant and the USFS. <br /> This concludes the Division's adequacy review of this application.This letter shall not be interpreted to mean that <br /> there are no other technical deficiencies in your application;other issues may arise as additional information is <br /> supplied. Please be advised the permit application may be deemed inadequate, and the application may be denied <br /> on October 18, 2018,unless the above mentioned adequacy review items are addressed to the satisfaction of the <br /> Division. If more time is needed to complete the reply,the Division can grant an extension to the decision <br /> date. This will be done upon receipt of a written waiver of the Applicant's right to a decision by October <br /> 18,2018,and the request for additional time. This must be received no later than the deadline date. <br /> If you need additional information or have any questions,please contact me at Division of Reclamation,Mining <br /> and Safety, 1313 Sherman Street,Room 215,Denver,CO 80203,by telephone at 303-866-3567 x8132,or by email <br /> at elliott.russell wstate.co.us. <br /> Sincerely, <br /> Elliott R. Russell <br /> Environmental Protection Specialist <br /> Enclosures: Division of Water Resources comment letter M2018036 <br /> History Colorado comment letter M2018036 <br /> Cc: Michael Cunningham,DRMS <br />