Laserfiche WebLink
Pelino Excavation TABLE 3 <br /> Jesse Lee Pit M84-043 (All values are in acre-feet) November 2018 <br /> Substitute Water Supply Plan-Summary <br /> (1 2) (3) (41 (5) <br /> Lagged Total Upper Arkansas <br /> Total Evaporative Operational loss Total Stream Stream Water <br /> Month Loss Depletions Conservancy <br /> depletions <br /> District Lease <br /> November 2017 0.04 0.09 0.13 0.14 0.14 <br /> December 2017 0.01 0.09 0.10 0.15 0.15 <br /> Water Year 2017 <br /> Total 0.05 0.18 0.23 0.29 0.29 <br /> January 2018 0.00 0.09 0.09 0.11 0.11 <br /> February 2018 0.03 0.09 0.12 0.13 0.13 <br /> March 2018 0.06 0.09 0.15 0.15 0.15 <br /> April 2018 0.09 0.11 0.20 0.23 0.24 <br /> May 2018 0.14 0.12 0.26 0.25 0.26 <br /> June 2018 0.18 0.12 0.30 0.30 0.31 <br /> July 2018 0.17 0.12 0.29 0.30 0.31 <br /> August 2018 0.12 0.12 0.24 0.19 0.19 <br /> September 2018 0.12 0.12 0.24 0.15 0.15 <br /> October 2018 0.08 0.11 0.19 0.16 0.16 <br /> Water Year 2018 <br /> Total 0.99 1.09 2.08 1.97 2.02 <br /> TOTAL 1.06 1.26 2.32 2.26 2.32 <br /> Notes: <br /> (1)from Table 1 <br /> (2)from Table 2 <br /> (3)Total Stream Depletions=Total Evaporative Loss+Total Operational Loss <br /> (4)Lagged Total Stream Depletions based on Glover techniques <br /> 15)Releases from Twin lakes Reservoir(the reservoir located furthest from the mining site)include a 0.07%ditch loss for approx.37 river miles <br />