Laserfiche WebLink
Mr. Scott Pelino <br /> November 27, 2018 <br /> Page 3 of 5 <br /> requirement has been removed. <br /> Conditions of Approval <br /> I hereby approve the proposed SWSP in accordance with §37-90-137(11), C.R.S. subject <br /> to the following conditions: <br /> 1. This SWSP is approved for the period of November 1, 2015 through October 31, 2018. <br /> The approval of this SWSP supersedes the previous SWSP dated February 5, 2015. A <br /> renewal request for this SWSP must be submitted to this office and the Division 2 <br /> office (please copy Kathy Trask at Kathy.Trask state.co.us) with the statutory fee <br /> (currently$257) no later than sixty days after receipt of this SWSP approval letter. <br /> 2. Well permit no. 67860-F(WDID 1105182)was obtained for the current use and exposed <br /> pond surface area of the gravel pit in accordance with 537-90-137(2) and (11), C.R.S. <br /> Permit condition#8 required a cross-sectional drawing of the extent of the intended <br /> excavation after the initial excavation. In order to maintain a valid well permit for <br /> the exposed groundwater, the required drawing needs to be provided. <br /> 3. The total surface area of the groundwater exposed at the Jesse Lee pit must not <br /> exceed 0.40 acre during the approval period of this SWSP resulting in an annual <br /> evaporative loss of 1.06 acre-feet. <br /> 4. The annual amount of water used at the operation shall not exceed 1.0 acre-foot for <br /> dust control and the total product mined shall not exceed 9,000 tons per year resulting <br /> in 0.26 acre-feet of water lost with the product. <br /> 5. All pumping for dust suppression must be metered in compliance with the <br /> "Amended Rules Governing the Measurement of Tributary Ground Water <br /> Diversions Located in the Arkansas River Basin". The meter shall be certified by <br /> a state approved Well Tester and the meter readings reported to the Water <br /> Commissioner and Division 2 office. Failure to comply with this condition may <br /> result in additional SWSPs not being approved in the future. <br /> 6. Accounting of water in this plan, including pumping, stream depletions, and <br /> replacement water deliveries must be provided to the Water Commissioner <br /> (JJA0.5UtJQn@state.co.U5)and Division Engineer <br /> (AUgmenlAtion.coordinatorostate.co.us)with the subject line"Pelino-Jesse Lee Pit <br /> SWSP"on forms and at times acceptable to them. Said accounting must be received <br /> by the 10t'of the month following the month being reported. The name, mailing <br /> address, and phone number of the contact person who is responsible for operation and <br /> accounting of this plan must be provided on the accounting forms. Failure to provide <br /> monthly accounting and reporting may result in an order from the Division Engineer <br /> and could result in fines and penalties of up to$500 per day. <br /> 7. The Applicant is responsible for coordinating the monthly release of required <br /> replacement water with the Upper Arkansas Water Conservancy District. <br />