Laserfiche WebLink
Page 42 <br /> Construction Materials Rule 1 <br /> Cessation and/or to allow the Office staff to conduct a site <br /> inspection or otherwise review the matter as necessary. <br /> (3) When no reclamation or performance standard issues or problems <br /> are indicated in the Notice of Temporary Cessation or by field or file <br /> inspection, and no concerns are expressed by interested persons, <br /> the Notice shall not be placed on the agenda or heard by the Board. <br /> In such cases, the county and appropriate municipality will be <br /> notified and the fact of the receipt of the Notice by the Office will be <br /> acknowledged in the monthly activity report attached to the monthly <br /> agenda. <br /> 1.13.7 Application Requirements - Substitute for Notice of Temporary <br /> Cessation <br /> 103(11)(b) Where certain mining operations have periods of inactivity exceeding one <br /> hundred eighty (180) days, the Operator may include in the permit <br /> application, amendment or technical revision, the information otherwise <br /> required when filing a Notice of Temporary Cessation. (Please see Rules <br /> 6.3.3(1)(a) or 6.4.4(e).) If approved by the Board or Office, such Notice in <br /> the permit shall serve as a substitute for the Notice of Temporary Cessation <br /> with the following conditions: <br /> (a) The Operator must report to the Board through the Annual Report: <br /> (i) the condition of the operation at the time of cessation; <br /> (ii) what specific measures have been and will be implemented <br /> to comply with reclamation and performance standards;and <br /> (iii) plans for resumption of mining. <br /> 103(11)(c) 1.13.8 Five Year Term of Temporary Cessation <br /> (1) A permit granted pursuant to these Rules shall continue in effect as <br /> long as: <br />