Laserfiche WebLink
EOUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: GRAND JUNCTION <br />Total one-way travel distance: 40.00 miles <br />Average Travel Speed: 45.00 mph <br />Total Non-Roadable Mob/Demob Cost * $10,750.13 <br />'*two round trips with haul rig: <br />Total Roadable Mob/Demob Cost ** $0.00 <br />** one round trip, no haul rig: <br />Transportation Cycle Time: <br />JOB TIME AND COST <br />Total job time: 9.56 Hours <br />Total job cost: $10,750 <br />Non-Roadable <br />Roadable <br />Equipment <br />Equipment <br />Haul Time (Hours): <br />0.89 <br />0.89 <br />Return Time (Hours): <br />0.89 <br />0.89 <br />Loading Time (Hours): <br />1.50 <br />NA <br />Unloading Time (Hours): <br />1.50 <br />NA <br />Subtotals: <br />4.78 <br />1.78 <br />JOB TIME AND COST <br />Total job time: 9.56 Hours <br />Total job cost: $10,750 <br />