Laserfiche WebLink
- Floor <br />40'x80'x6" <br />Demo. and on- <br />3,200.00 <br />SF <br />$0.83 <br />$2,652.80 <br />site disposal in <br />existing pit, 6 in. <br />thick - Max. <br />10,000 ft. haul <br />Mine Fan and <br />8'X10'X30' <br />Bldg. (SN) <br />2,400.00 <br />CF <br />$0.20 <br />$487.20 <br />Housing <br />demo./on-site <br />disposal in <br />excavated pit - <br />Max. 10,000 ft. <br />haul <br />18" Culvert <br />230 LF <br />Pipe, corrugated <br />230.00 <br />LF <br />$3.78 <br />$869.63 <br />metal (CMP) - <br />18 in. diameter <br />pipe <br />24" Culvert <br />120 LF <br />Pipe, corrugated <br />120.00 <br />LF <br />$4.88 <br />$585.48 <br />metal (CMP) - <br />24 in. diameter <br />ie <br />30" Culvert <br />100 LF <br />Pipe, corrugated <br />100.00 <br />LF <br />$6.29 <br />$629.10 <br />metal (CMP) - <br />30 in. diameter <br />pipe <br />36" Culvert <br />15 LF <br />Pipe, corrugated <br />15.00 <br />LF <br />$7.53 <br />$112.98 <br />metal (CMP) - <br />36 in. diameter <br />ie <br />42" Culvert <br />160 LF <br />Pipe, corrugated <br />160.00 <br />LF <br />$10.75 <br />$1,720.64 <br />metal (CMP) - <br />48 in. diameter <br />ie <br />48" Culvert <br />75 LF <br />Pipe, corrugated <br />75.00 <br />LF <br />$10.75 <br />$806.55 <br />metal (CMP) - <br />48 in. diameter <br />pipe <br />Fencing <br />330 LF <br />Fencing, chain <br />330.00 <br />LF <br />$2.62 <br />$864.60 <br />link, including <br />posts and fabric <br />- to 6 ft. high <br />Petroleum <br />Assume 60 <br />Dispose of <br />60.00 <br />CY <br />$300.00 <br />$18,000.00 <br />Contaminated <br />CY <br />decontaminated <br />Soil Removal <br />soil - Average <br />Removed Fiber <br />2,370 LF <br />Utility Poles, <br />24.00 <br />EA <br />$214.50 <br />$5,148.00 <br />Optic Line <br />Wood 20' to 0' <br />high (each pole) <br />Subtotal <br />Job Hours: 330.00 (unadjusted): $81,909.43 <br />1XXV <br />Total Cost <br />(adjusted for <br />location): $80,680.79 <br />