Laserfiche WebLink
Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />0.70 Minutes <br />0.60 Minutes <br />Site Altitude: 5600 feet <br />Push Dozer Source <br />Altitude Adj: 1.000 NA (CAT ] <br />Job Efficiency: 0.830 NA (CAT ] <br />Net Correction: 0.830 NA <br />Travel Time: <br />Road Condition: Rutted dirt, little maintenance, no water, 2" tire penetration 5.0 <br />Haul Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res (%) <br />Total Res (%) <br />Velocity (fpm) <br />Travel Time (min) <br />1 <br />2100.00 <br />8.30 <br />5.00 <br />13.30 <br />834 <br />2.54 <br />Haul Time: 2.54 minutes <br />Return Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res (%) <br />Total Res (%) <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />2100.00 <br />-8.30 <br />5.00 <br />-3.30 <br />2938 <br />0.77 <br />Return Time: <br />Total Scraper team cycle time: <br />Adjusted for job conditions: <br />Selected Number of Scrapers: <br />Adjusted single scraper team (unit) hourly production: <br />Adjusted multiple scraper team (fleet) hourly production: <br />Unadjusted unit production/hour: 245.34 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />0.77 minutes <br />4.61 <br />minutes <br />203.63 <br />LCY/Hour <br />1 <br />Scraper(s) <br />203.63 <br />LCY/Hour <br />203.63 <br />LCY/Hour <br />Fleet size: 1 Team(s) Total job time: 5.90 Hours <br />Unit cost: $1.271 /LCY Total job cost: $1,527 <br />fix <br />