Laserfiche WebLink
Fleet size: 1 <br />Unit cost: $0.380 <br />Task description: Regrad <br />Site: McClane Canyon Mine <br />PROJECT IDENTIFICATION <br />Task #: 018 <br />Date: 9/5/2018 <br />User: TNL <br />Excavator Total job time: <br />/LCY Total job cost: <br />BULLDOZER WORK <br />Coal Mine Waste Pile Pond <br />Permit Action: RN8 <br />State: Colorado <br />County: Garfield <br />0.71 Hours <br />$89 <br />Permit/Job#: C1980004 <br />Agency or organization name: <br />DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D9T - 9SU <br />Horsepower: 405 <br />Blade Type: Semi -Universal <br />Attachment: 3 -shank ripper <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost/Hour: <br />$110.70 <br />NA <br />Operating Cost/Hour: <br />$95.46 <br />100 <br />Ripper own. Cost/Hour: <br />$12.36 <br />NA <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/flour: <br />$41.52 <br />NA <br />Total unit Cost/Hour: $260.05 <br />Total Fleet Cost/Hour: $260.05 <br />MATERIAL QUANTITIES <br />Initial Volume: 3,500 <br />Swell factor: 1.165 <br />Loose volume: 4,078 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />Materials consistency description: <br />Average push gradient: 5% <br />Average site altitude: 5,6 <br />Material weight: 2,9 <br />125 feet <br />1,055.6 LCY/hr <br />00 feet <br />O0 lbs/LCY <br />fill or embankment 0.9 <br />lvi <br />Abbreviation: None <br />Filename: 018 <br />