My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-11-26_GENERAL DOCUMENTS - C1980004
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1980004
>
2018-11-26_GENERAL DOCUMENTS - C1980004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2018 10:29:20 AM
Creation date
11/27/2018 11:24:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004
IBM Index Class Name
General Documents
Doc Date
11/26/2018
Doc Name Note
For RN8
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
McClane Canyon Mining, LLC
Permit Index Doc Type
Findings
Email Name
CCW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Unit cost: $385.397 Per acre <br />Total job cost <br />HYDRAULIC EXCAVATOR WORK <br />Task description: Pull Main Haul Road Fill Material to Base of Cut <br />Site: McClave Canyon Mine Permit Action: RN8 <br />PROJECT IDENTIFICATION <br />Task #: 011 <br />Date: 9/5/2018 <br />User: TNL <br />State: Colorado <br />County: Garfield <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat 324D L 9'-8" Stick <br />Attachment 1: ROPS Cab <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost/flour: $42.29 NA <br />Operating Cost/Hour: $44.49 100 <br />Operator Cost/flour: $37.79 NA <br />Total Unit Cost/Hour: $124.56 <br />$185 <br />Bench <br />Permit/Job#: C1980004 <br />Abbreviation: None <br />Filename: 011 <br />Horsepower: <br />194 <br />Weight (MT): <br />24.85 <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Total Fleet Cost/Hour: $124.56 <br />MATERIAL QUANTITIES <br />Initial volume: 6,050 CCY Swell factor: 1.250 <br />Loose volume: 7,563 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Excavator Cycle Time (load bucket, swing loaded, dump bucket, swing emVty): <br />Basic Job Condition Description: AVERAGE <br />Secondary Job Condition within Basic Description: AVERAGE <br />Cycle Time Value: 0.293 minutes <br />Load Bucket Capacity <br />Rated Capacity: 2.26 <br />LCY (heaped) <br />Bucket Fill Factor: 0.975 <br />Sand and grav <br />Adjusted Capacity: 2.20 <br />LCY <br />Job Condition Correction Factors <br />Bucket Size Class: Medium <br />- 100%) 0.975 <br />Site Altitude: 5600 feet <br />Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.83 multiplier <br />Unadjusted Hourly Unit Production: 451.23 LCY/Hour <br />Adjusted Hourly Unit Production: 374.52 LCY/Hour <br />Adjusted Hourly Fleet Production: 374.52 LCY/Hour <br />xliv <br />
The URL can be used to link to this page
Your browser does not support the video tag.