My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-11-26_GENERAL DOCUMENTS - C1980004
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1980004
>
2018-11-26_GENERAL DOCUMENTS - C1980004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2018 10:29:20 AM
Creation date
11/27/2018 11:24:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004
IBM Index Class Name
General Documents
Doc Date
11/26/2018
Doc Name Note
For RN8
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
McClane Canyon Mining, LLC
Permit Index Doc Type
Findings
Email Name
CCW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Unit cost: $385.397 Per acre Total job cost: $2,582 <br />BULLDOZER RIPPING WORK <br />Task description: Rip CmClane to Munger Haul Road <br />Site: McClane Canyon Mine Permit Action: RN8 Permit/Job#: C1980004 <br />PROJECT IDENTIFICATION <br />Task #: 009 State: Colorado Abbreviation: None <br />Date: 9/5/2018 County: Garfield Filename: 009 <br />User: TNL <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D9T - 9SU Horsepower: 405 <br />Ripper Attachment: 3 -Shank Ripper Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />$110.70 <br />Utilization % <br />NA <br />$95.46 <br />100 <br />$12.36 <br />NA <br />$7.88 <br />100 <br />$41.52 <br />NA <br />Ownership Cost/Hour: <br />Alternate Methods: <br />Operating Cost/Hour: <br />Ripper Ownership Cost/Hour: <br />NA <br />Ripper Operating Cost/Hour: <br />Area: 0.48 acres Rip Depth (ft): <br />Operator Cost/Hour: <br />Volume: 1,549 <br />Total Unit Cost/Hour: <br />$267.92 <br />Total Fleet Cost/Hour: $267.92 <br />MATERIAL QUANTITIES Selected estimating method: Area <br />Alternate Methods: <br />Seismic: NA Bank Volume: <br />NA <br />BCY NA <br />Area: 0.48 acres Rip Depth (ft): <br />2.00 <br />Volume: 1,549 <br />Source of estimated quantity: Figure 2-2-2; Operator <br />Estimate <br />HOURLY PRODUCTION <br />Seismic: <br />Seismic Velocity: <br />NA <br />feet/second <br />Area: <br />Average Ripping Depth: <br />2.63 <br />mph <br />Average Ripping Width: <br />7.67 <br />degrees <br />Average Ripping Length: <br />200.00 <br />feet <br />Average Dozer Speed: <br />88.00 <br />feet <br />Average Maneuver Time: <br />0.25 <br />feet <br />Production per unit area: <br />0.838 <br />acres/hour <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: <br />0.838 <br />Acres/hr <br />Site Altitude: <br />5,600 <br />feet <br />Altitude Adj: <br />1.00 <br />(CAT HB) <br />Job Efficiency: <br />0.83 <br />(1 shift/day) <br />Net Correction: <br />0.83 <br />multiplier <br />Adjusted Hourly Unit Production: <br />0.70 <br />Acres/hr <br />Adjusted Hourly Fleet Production: <br />0.70 <br />Acres/hr <br />19 <br />BCY or CCY <br />
The URL can be used to link to this page
Your browser does not support the video tag.