Laserfiche WebLink
Material consistency: <br />0.900 <br />Dozing method: <br />1.000 <br />Visibility: <br />1.000 <br />Job efficiency: <br />0.830 <br />Spoil pile: <br />0.800 <br />Push gradient: <br />1.000 <br />Altitude: <br />1.000 <br />Material Weight: <br />0.793 <br />Blade type: <br />1.000 <br />Net correction: 0.3554 <br />Adjusted unit 665.31 LCY/hr <br />production: <br />Adjusted fleet 665.31 LCY/hr <br />production: <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.391/LCY <br />Total job time: 2.98 Hours <br />Total job cost: $774 <br />(CAT HB)) <br />(GEN.) <br />(AVG.) <br />SHIFT/DA <br />(SSD -AC) <br />(CAT HB) <br />(CAT HB) <br />(CAT HB) <br />(PAT) <br />