Laserfiche WebLink
TR04 RECEIVED <br /> NOY 2 8 7018 <br /> t^(�-•. <br /> JPUmac OF REQAMOM <br /> COLORADO DIN ISIO` OF RECLAAIATIO\, MINIM G A_ " <br /> 1313 Sherman Saeet.Roam i Dearer.Colorado 80203 ph(303)966-3567 <br /> REQUEST FOR TEC WZC AL REN ISIO\JR)C OVER SHEET <br /> 1984-008 Barnhart Gravel Pit W 0 3 File No `vl- Site Name. K 3 � <br /> Pueblo <br /> Countv TRt, 0PUfS Use onty) _0' <br /> Peruttee:Continental Materials Corporation Q co <br /> operator(If otber Pernuttee):Transit Mix Concrete CO. �than 0 <br /> En <br /> Pernttee Representative: <br /> Mr. Brandon Heser, Transit Mix Concrete Co.(719) 313-0316 0 <br /> Please provide a brief desorption of the proposed recision: <br /> Request to revise the approved. under pre#orirang, seed mix with a seed mix better suited to <br /> site conditions. o <br /> As defined by the Minerals Rules. a Technical Revision JR)is: "a change in the permit or application t` m <br /> which does not have more than a minor effiect upon the approved or proposed Reclamation or 0 O <br /> Environmental Protection Plan" The Division is charged with determining if the revision as submitted 0 <br /> meets this definition If the Division determines that the proposed revision is beyond the scope of a TR <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> a,.Ision(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process After the TR is submitted with the appropriate fee.the Division will <br /> determine if it is approvable within 30 days If the Division requires additional information to approve a <br /> TR you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day rev iea•period there are still outstanding deficiencies.the Division must deny the TR unless the <br /> pemuttee requests additional time.in titiTkW.to provide the required information <br /> There is no pre-defined format for the submittal of a TR:however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request.including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR <br /> Required Fees for Technical Revision by Perot Type-Please mark the correct fee and submit it with <br /> your request for a Technical Revision_ <br /> Permit Type Required TR Fee Submitted(mark only one) <br /> 110c. 111. 1 U construction <br /> materials.and 112 quarries S216 <br /> 112 hard rock(not D`%ZO) S175 ❑ <br /> 110d. 112d(1.2 or 3) S1006 <br /> 7 <br />