Laserfiche WebLink
Revision to the permit addressing slope stability analyses to allow deeper excavations near the <br /> permit boundary. <br /> As stated above, all benching will be temporary and created on an as-needed basis. There are <br /> no pit plans, as there are no permanent open pits that will result from our work. There are no <br /> high walls, merely exploration trenching. There are no engineered stability plans, again as <br /> there are no pit plans, merely exploration trenching. There is no "orebody". There are no <br /> reserves or known resources. At the risk of being redundant -this is merely exploration <br /> trenching. <br /> We (ZyMin Corporation, as the Applicant) hereby commit to maintaining a 3H:1V ratio for <br /> distance from the permit boundary to depth of excavation (i.e., an excavation of 15 feet should <br /> be no closer to the permit boundary than 45 feet). <br /> 1�6 QROFESSIpy,,c <br /> S - <br /> w <br /> � \O <br /> O <br /> 9r� ALES E• <br /> A/FQ PROFESS�� <br />