My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-11-21_REVISION - M2004044 (21)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2004044
>
2018-11-21_REVISION - M2004044 (21)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2025 7:31:49 AM
Creation date
11/21/2018 1:46:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004044
IBM Index Class Name
Revision
Doc Date
11/21/2018
Doc Name Note
Part 1 of 5
Doc Name
Request For Amendment To Permit
From
Aggregate Industries-WCR
To
DRMS
Type & Sequence
AM1
Email Name
JLE
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scenario 8:West Cell Mining and Post Mining(Isolated)-This scenario simulates the mining of all <br /> of Tucson South without the influence of the Challenger Pit and Baseline Mine. The purpose of this <br /> scenario is to determine the effects of only this proposed mine. <br /> Table 3: Summary of Scenarios <br /> Status of Variables For Each Scenario <br /> Variable 1 la 2 3 4 <br /> Old Seltzer Well on on on off off <br /> New Seltzer Well off off off on on <br /> Greenhouse Wells on on on on on <br /> Rogers Unlined Cell dewater lake lake lake dewater <br /> Challenger Pit - - - - dewater <br /> Tucson South: East Cell <br /> Tucson South: West Cell - - - - - <br /> Tucson South: SW Cell - - - - - <br /> Baseline Mine - - - - - <br /> calibration no new Seltzer <br /> Scenario Description calibration "existing Early Mining <br /> dewater off mming conditions" <br /> Status of Variables For Each Scenario <br /> Variable 5 6 6max 7 8 <br /> Old Seltzer Well off off Off off off <br /> New Seltzer Well on on MAX on on <br /> Greenhouse Wells on on on on on <br /> Rogers Unlined Cell fines fines Fines fines fines <br /> Challenger Pit dewater no flow no flow - - <br /> Tucson South: East Cell no flow no now no flow no flow no flow <br /> Tucson South. West Cell - no flow no flow - no flow <br /> Tucson South: SW Cell lake fines fines lake fines <br /> Baseline Mine dewater lake lake - - <br /> Scenario Description east cell post mine Post east cell post mine <br /> mine isolated isolated <br /> Figures 5-14 show the relative change in water levels between the pre-mining existing conditions <br /> (scenario 3) and subsequent scenarios. In the figures,positive contours show increases in water level <br /> (mounding)while negative contours show decreases(drawdown). <br /> Figures 5 and 6 show the maximum simulated change in alluvial groundwater levels for scenario 4,the <br /> early mining stage during the wet and dry seasons,respectively. The figures show that the dewatering <br /> of the Challenger and southern portion of the Rogers Pit has a significant impact. The zone of notable <br /> drawdown(more than 2 feet)extends about 7600-8000 feet north-south and 3800-4300 feet east-west <br /> during the wet and dry seasons respectively.The maximum simulated drawdown is 16 feet during the <br /> dry season and 18 feet during the wet season. The greater drawdown during the wet season is the result <br /> of having to keep a constant low water level around mines during dewatering even though groundwater <br /> -9- August 2004 <br /> L-\39I9 OI9\TS GW ModeTTS Report\Tucson South Rpt_Iha&doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.