Laserfiche WebLink
(10)All mined material to be disposed of within the affected area will be handled in such a manner to prevent any <br /> unauthorized release of pollutants to the surface drainage system. <br /> (11) No unauthorized release of pollutants to groundwater shall occur from any materials mined, handled or disposed <br /> of within the permit area. <br /> More specific information regarding how Al will comply with the performance standards is outlined below. <br /> Final Proposed Land Use <br /> The current land use for the Tucson South Resource property is a combination of partially reclaimed mining area, <br /> dryland agriculture, upland meadow and a City of Aurora water facility. The City of Aurora water facility(located <br /> outside the Affected Lands, west of the Brighton Ditch)will be removed from the Permit Boundary at a future date <br /> and continue to operate. The proposed final land use for the remainder of the property is lined municipal water <br /> storage for the West cell and the majority of the East cell, upland meadow on the northern portion of the East cell and <br /> an upland meadow for South cell. Surrounding land uses include:Water storage to the north, rural residential and <br /> agriculture to the south,Town of Brighton wildlife conservation area and the South Platte River to the east and water <br /> storage and suburban residential to the west. The lined storage and upland meadows are compatible with existing <br /> and future adjacent land uses. This property lies within the City of Brighton Urban Growth area and is designated as <br /> natural resource conservation and flood plain on the 2016 Future Land Use Map. <br /> General Overview of the Reclamation Plan <br /> Types of Reclamation acres <br /> Reclamation of the proposed permit area will contain two land forms; uplands and lined,open water reservoirs. <br /> Cottonwoods and shrubs will be planted along the South Platte River on the eastern side of the east cell. Timing and <br /> installation of the plantings will be coordinated with the Urban Drainage and Flood Control District. It is anticipated <br /> that these plantings will be installed prior to mining in the East cell and will be established as part of the concurrent <br /> reclamation of the site. The primary reclamation process will be backfilling the slopes of the mined-out areas to be <br /> reclaimed as reservoirs and backfill of the South cell and the partially reclaimed area on the northern end of the East <br /> cell to create an upland meadow. Overburden,and non-marketable materials from the site will be used as backfill. <br /> As mined out cells are backfilled, rough grading will establish the slopes and elevations necessary to facilitate the <br /> appropriate land form for that specific area of the site. In upland areas backfill materials will be placed to an elevation <br /> near or below the pre-mining surface elevation. For areas where reservoirs are to be located, backfill will be used to <br /> create pond side slopes. Pond depth may extend all the way to bedrock and side slopes will be 3H:1 V or flatter. <br /> Except for pond slopes below normal average highwater surface elevation, all areas disturbed by mining activities will <br /> be prepared with topsoil to a minimum of 6 to 12 inches and revegetated during reclamation. Revegetation will <br /> generate a blend of upland grass species. Given suitable precipitation, seeding should produce good vegetation <br /> cover over much of the reclaimed site. Roads not necessary for future access and other disturbed areas will be <br /> reclaimed with topsoil and overburden replacement and vegetative cover to stabilize the areas and minimize erosion. <br /> Reclamation Measures/Materials Handlinq <br /> All available topsoil and overburden material will be used for backfilling and reclamation. Earth moving equipment <br /> may include, but is not limited to dozers, loaders,scrapers,and excavators. Additional farm equipment for grading <br /> and seeding may be used for revegetation activities. <br /> Aggregate Industries Tucson South Resource <br /> Permit#M-2004-044 112 Permit Amendment <br /> Page E-2 <br />