Laserfiche WebLink
-4- <br /> 12. Primary future(Post-mining)land use(check one): <br /> Cropland(CR) Pastureland(PL) General Agriculture(GA) <br /> Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br /> Developed Water Resources(WR) Solid Waste Disposal(WD) <br /> 13. Primary present land use(check one): <br /> Cropland(CR) Pastureland(PL) General Agriculture(GA) <br /> Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) Recreation(RC) I" Industrial/Commercial(IC) <br /> Developed Water Resources(WR) <br /> 14. Method of Mining: Briefly explain mining method(e.g.truck/shovel): <br /> Scrapers, and front end loaders remove topsiol and a wet dredge is used to mine. <br /> 15. On Site Processing: ✓ Crushing/Screening <br /> 13.1 Briefly explain mining method(e.g.truck/shovel): Dredged material is transferred to a crushing/screen plant for <br /> processing then stockpiled for use aft he concrete and asphalt batch plants.. <br /> List any designated chemicals or acid-producing materials to be used or stored within permit area: <br /> None <br /> 16. Description of Amendment or Conversion: <br /> If you are amending or converting an existing operation,provide a brief narrative describing the proposed change(s). <br /> This amendment is to add 21.25 acres to the permit area. Approximately 15.0 acres of this <br /> addition are existing industrial areas where a Concrete Batch Plant, an Asphalt Batch Plant and <br /> steekpile areas are located near Riverside Drive. Addition of this new area moved the affeeted <br /> lands/ permit area to the property lines. Areas around the lakes will re resoiled and revegetated <br /> and the final industrial use area of 8.23 acres will remain when mining ends. <br />