Laserfiche WebLink
Exhibit E Reclamation Plan (cont) <br /> Prior to final reclamation in Lake Robert an armored inlet <br /> will be built in this area like what was done on the north end. <br /> The design and construction plans for this inlet structure, <br /> backfill outline and a final reclamation configuration will be <br /> filed as a Technical Revision to the permit prior to the perma- <br /> nent structure being built . <br /> AMENDMENT 7 - Revised Reclamation Timetable <br /> The Timetable reflects the areas shown on the new maps in <br /> this amendment . <br /> ACRES t <br /> PHASE YEARS TOTAL WATER ROAD REVEG LAKE BACK DITCH INDUSTRIAL/ <br /> BOTTOM SLOPE AREA* MISC. ** <br /> BELOW <br /> WATER <br /> Lake Marjorie 4-6 26. 14 15.00 0.70 6.24 6.65 8.35 1.02 3 .18 <br /> Lake Robert 4-6 22 .72 5.10 0.95 8.90 3 .04 2.06 1.02 1.75 <br /> West Lake 4-6 26.85 18.18 0.00 5.35 9.12 9.06 0.00 3 .32 <br /> TOTALS 1 107.571 61.571 2.671 26.181 32 .041 29.531 2 .041 10.11 <br /> * Ditch area in old area will not be disturbed. <br /> ** Asphalt Plant, Concrete Plant & Parking Area <br /> 12 <br />