Laserfiche WebLink
Exhibit D MINING PLAN <br /> Unless specifically discussed below the methods described in <br /> the November 1976 and August 2000 Mining and Reclamation Plans <br /> and Technical Revisions filed on 12/23/1983 , 3/28/1991, 5/8/2012 , <br /> 8/28/2012 and 7/24/2015 will remain unchanged. <br /> In 1976 the application was for a 46 . 55 acres ± permit area <br /> that would be reclaimed as 2 lakes and the surrounding area would <br /> be resoiled and revegetated. Mining was to be done in 4 Stages <br /> by a wet dredge starting on the west part of the property in Lake <br /> Marjorie near the asphalt plant and the processing site was to be <br /> the south end of Lake Marjorie . Mining would then move to Lake <br /> Robert and mine from north to south. With the final area to be <br /> mined being the south end of Lake Marjorie . <br /> In 1983 , a Technical Revision was filed to reconfigure Stage <br /> 1 (north side of Lake Marjorie) , add a bridge to cross the <br /> Lowline Ditch, revise the seed mix and mulching requirements and <br /> recalculate the bond. <br /> The Technical Revision filed in 1991 was to remove the <br /> staging, move the bridge to the south permit line, revise the <br /> Mining Plan and it' s Timetable and Reclamation Plan and it' <br /> Timetable and recalculate the bond. <br /> The permit was amended in 2000 to add approximately 39 . 80 <br /> acres ± that is now the West Area containing 2 lakes, East Lake <br /> and West Lake . The total permit area is now 86 . 35 acres ± . <br /> Method of mining did not change and mining would start on the <br /> north end of West Lake when mining in Lake Robert was done, then <br /> move to the East Lake and finish on the south End of Lake Marjo- <br /> rie . <br /> In 2012 two (2) Technical Revisions were filed, the first <br /> was to add a provision for minor blasting at the mine to facili- <br /> tate keeping the mining face in a safe configuration. The second <br /> added a Weed Control Plan to the permit . <br /> The most recent Technical Revision was required as a result <br /> of the September 2013 South Platte River flood event . It in- <br /> volved revisiting the permit for the Lake Robert area where the <br /> river had entered the mine and backfilled nearly 5 . 0 acres of the <br /> south end, destroyed most of the reclamation that was completed <br /> on the lake shore and left a flood overflow channel bisecting <br /> Lake Robert . It was anticipated flood water would continue to <br /> flow thru the channel and enter the Lake Robert area whenever the <br /> Platte River flooded. An armored outlet structure was installed <br /> in the north lake shore and the south shore was left open. The <br /> fill area was left to be naturally revegetated since it was sand <br /> washed in by the river and there is no topsoil for that area . <br /> The current plan for the Lake Robert area is to grade the above <br /> water slopes to 3 : 1 . The below water slope were washed to <br /> flatter then 3 : 1 by the flood, prior to the flood reclamation was <br /> pretty well done in the Lake Robert area . A graveled equipment <br /> parking area was added and a concrete pad left from the dredging <br /> operations was retained in this Technical Revision since these <br /> will be used for equipment parking in the future . <br /> The current bond is $131, 200 and a new reclamation cost <br /> estimate is presented in Exhibit L on page 45 of this applica- <br /> tion. Existing sloping, grading and shaping plans will apply to <br /> 6 <br />