My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-11-19_PERMIT FILE - M2018057
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2018057
>
2018-11-19_PERMIT FILE - M2018057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 3:31:57 AM
Creation date
11/19/2018 4:45:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2018057
IBM Index Class Name
PERMIT FILE
Doc Date
11/19/2018
Doc Name
Incompleteness Response
From
RPM, Inc.
To
DRMS
Email Name
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
any significant stability problems. These partially excavated zones shall be graded <br /> no steeper than 2H:1 V and revegetated so that there are no unstable situations or <br /> erosion problems. <br /> (2) All 110 or Non In Situ Leach Mining 110d Limited Impact applications must provide an <br /> estimate of the actual costs to reclaim the site based on what it would cost the State of Colorado <br /> using an independent contractor to complete reclamation <br /> Please see Attachment VI for the Reclamation Cost Estmate. <br /> Note: The following sections are the Reclamation Performance standards. Upon completion <br /> of this section, the application narrative will begin with Section 6.3.7 <br /> ----------------------------------------------------------------------------------------------------------------------- <br /> R ULE 3: RECLAMATION PERFORMANCE STANDARDS, INSPECTION, <br /> MONITORING, AND ENFORCEMENT <br /> 3.1 RECLAMATIONPERFORMANCESTANDARDS <br /> 3.1.1 Establishing Post-Mining Use <br /> (1) In consultation with the Landowner, where possible, and subject to the approval <br /> of the Board or office, the Operator shall choose how the affected lands shall be reclaimed <br /> The post mining land use will be wildlife habitat. <br /> 3.1.2 Reclaiming Substituted Land <br /> The Operator does not plan on the substitution of lands for reclamation. <br /> 3.1.3 Time Limit and Phases Reclamation <br /> (1) For any in situ leach mining operation, reclamation of ground water in <br /> accordance with the approved reclamation plan shall begin immediately upon: <br /> Section 3.1.2 (1) does not apply since this is not an in situ leach mining operation. <br /> 3.1.4 Public Use <br /> The public will not be allowed casual use of the site it is private property. <br /> 3.1.5 Reclamation Measures—Material Handling <br /> (1) Grading shall be carried on so as to create a final topography appropriate to the <br /> final land use selected in the Reclamation Plan. <br /> 43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.