Laserfiche WebLink
-4- <br /> ' 12. Primau future Post-minin land use check one): <br /> El Cropland(CR) Pastureland(PL) General Agriculture(GA) <br /> Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> ' Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br /> �✓ Developed Water Resources(WR) F Solid Waste Disposal(WD) <br /> ' 13. Primary present land use check one): <br /> Cropland(CR) Pastureland(PL) General Agriculture(GA) <br /> ' Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br /> tDeveloped Water Resources(WR) <br /> 14. Method of Mining: Briefly explain mining method(e.g.truck/shovel): <br /> ' Excavator and dump truck <br /> 15. On Site Processing: F-1 Crushing/Screening <br /> 13.1 Briefly explain mining method(e.g.truck/shovel): <br /> ' All material will be hauled off-site for processing at the Bucklen Pit (M-1982-131) <br /> List any designated chemicals or acid-producing materials to be used or stored within permit area: <br /> ' None <br /> ' 16. Description of Amendment or Conversion: <br /> If you are amending or converting an existing operation,provide a brief narrative describing the proposed change(s). <br /> ' n/a <br /> 1 <br />