My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-11-13_INSPECTION - C2010089
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C2010089
>
2018-11-13_INSPECTION - C2010089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2018 10:34:48 AM
Creation date
11/15/2018 9:36:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
Inspection
Doc Date
11/13/2018
Doc Name
OSM Inspection Report
From
OSM
To
DRMS
Inspection Date
11/6/2018
Email Name
BFB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T_ r U.S. DEPT. OF THE INTERIOR <br />�- its•. <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation <br />State Program <br />1. Permittee/Person <br />ELK RIDGE MINING AND RECLAMATION LLC <br />2. Address <br />P.O. BOX 33695 <br />3. City 4. State <br />DENVER CO <br />5. Ziv Code 6. Phone Number <br />80233 (303)452-6111 <br />9. Permit Number 1 O. Permit Type <br />C2010089 PP <br />11. Field Visit Date <br />12. Purpose <br />13. SRA Present <br />11/6/2018 <br />JOB3 <br />0 <br />m am r.*r <br />14. Permit Status <br />15. Site Status <br />16. FaclliT pe <br />t <br />© <br />AN 1A <br />17. OSM Office # <br />18. CCID # <br />19. Land Code <br />140 - <br />7. Operator Name, if Different than Permittee 20. M.S.H.A. ID # 21. State Abbrev. 22. Cour Burrough <br />ELK RIDGE MINING AND RECLAh1ATION LLC 05-00299 = F-C-0-1&IONTRoslt <br />8. Mine Name 23. AVS Permittee Entity ID Number 24. State Office <br />NEW IIORIZON NORTII 1258291 <br />25. Hours 26. Signature Block 27. Reviewing Official: <br />1.0 a. Permit Review .t� <br />3.0 b. Site Visit Time Signature Signature <br />12.0 c. Travel Time Christine Belka, IDii182 <br />d. Report Writing Inspector's Name Revic bees Name <br />3.0 <br />Date: 11113/2018 Date: <br />Oxx...Oversight RFx, Reclamation Fees CC... Citizen Complaint (initial site visit) <br />Axx.-Assistance Fxx. Federal Actions CCF .Assistance <br />MIR Inspection - Item _13 A joint inspection is when a state inspector accompanies an OSM Inspector at any time during 97e review of the mine site <br />Permit Status -Item 14 AB Abandoned All surface and underground coal mining activities have ceased and operator <br />A Active: Coal mining activities occurring or permitted but not yet has left the site without completing reclamation as defined In 30 CFR 840 11(g) <br />disturbed. ABI Bond Forfeiture Bond forfeiture officially in processor completed and reclamation in <br />IN Inactive (Permanent Program Permit): Phase 11 completed or progress or not yet commenced <br />Temporary Cessation of Operations (Interim Program Permit) AB2 Partially Reclaimed Forfeiture- Forfeited site where all bonds have been used to reclaim site. <br />Coal mining completed and reclamation activities Initiated but site not reclaimed to Program standards. <br />BR Bond Release: Reclamation completed and State Regulatory AS3 Reclaimed Forfeiture- Forfeited site that has been reclaimed to Program standards. <br />Authority(RA) has released all of the bond (Phase Ill Release) NA Not Applicable- When site is unpermitted. <br />Site Status - Item 16 MC Mining Complete No mining activity on site, site NS Non -Site Visit Status of site not determined. <br />NO No Disturbance: No coal mining and reclamation regraded and awaiting bond release Forfeiture Pending The RA is pursuing actions to <br />operations have been started. TC Temporary Cessation The RA has granted FP revoke the permit, collect the performance bond(s) <br />EX Coal Exploration: Coal exploration operations have cessation of mining pursuant to 30 CFR and/or reclamation of forfeited site is in progress <br />started and where coal mining operations have not 6161817 13(b) FR Forfeited and Reclaimed: Forfeiture reclamation <br />begun. P11 Phase I Release: At least Phase I bond release completed. <br />AP Active Coal Producing: Coal surface mining granted for entire permitted area. For Interim FO Abandoned Site: Abandoned site that is permitted but <br />activities are occurring. permits, partial bond release. there Is no bond. <br />AN Active Non -Producing: Active non -producing facility P2 Phase ll Release At least Phase 11 bond release WC Wildcat: Coal mining and reclamation operations have <br />such as tipple or preparation plant for the entire permitted area or are taking place and the activity is not covered by <br />NM No Mining: The Permit Status Is active, site is not in P3 Phase III Release Reclamation completed and the required permits from the RA. <br />Temporary Cessation, no surface mal mining the RA has released all bond <br />activity, and site not regraded. <br />Facility Type Codes - Rem 16 0... Ancillary (Haulroad. Conveyor and/or Rails H Exploration Permits K. Goverment Financed Construction Exemption <br />A....Surface E... Refuse and/or Impoundment 1 ..Notice of Intent to Explore L.. Remining site permitted under 30 CFR 765.25 <br />8....Underground F... Loading Facility andlorTipple J.,,,Exempt 16 and 2/3 <br />C....Preparation Plant G....Stockptes <br />Small Business Regulatory Enforcement Fairness Act (SBREFA) <br />Your Comments are Important <br />The Small Business and Agricullure Regulatory Enforcement Ombudsman and 10 Regional Falmess Boards were established to receive comments from small businesses about Federal agency <br />enforcement actlons. The Ombudsman will annually evaluate the enforcement activiles and rate each agency's responsiveness to small business. if you are a small business (a business with 500 or <br />fewer employees including those of affiliates) and wish to comment an the enforcemem or complianos acbvilles of OSM call I-Mil-RE13FAIR (M88-734.3247). p� 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.