Laserfiche WebLink
-4- <br /> 14. Primary future(Post-mining)land use(check one): <br /> nCropland(CR) Pastureland(PL) U General Agriculture(GA) <br /> Igl Rangeland(RL) Forestry(FR) III Wildlife Habitat(WL) <br /> IIResidential(RS) Recreation(RC) U Industrial/Commercial(IC) <br /> IIDeveloped Water Resources(WR) III Solid Waste Disposal(WD) <br /> 15. Primaryent land use(check one): <br /> Ei <br /> Cropland(CR) ®Pastureland(PL) Il <br /> ii_iGeneral Agriculture(GA) <br /> pRangeland(RL) <br /> Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) Recreation(RC) fn Industrial/Commercial(IC) <br /> Developed Water Resources(WR) <br /> 16. Method of Mining: 111 Quarry(QR) 111 Solution(SO) <br /> 16.1 Other: Briefly explain mining method(e.g.Placer,truck/shovel). <br /> Diesel-hydraulic equipment to trommels and sluice/wash plants. <br /> 17. On Site Processing: Solution(SO) El Chemical(CH) Thermal(TH) <br /> Heap Leach(HL) 11 Vat Leach(VL) <br /> List any designated chemicals or acid-producing materials to be used or stored within permit area: <br /> /lone <br /> Description of Amendment of Conversion: <br /> If you are amending or converting an existing operation,provide a brief narrative describing the proposed change(s): <br /> New permit. <br />