Laserfiche WebLink
Table 75 <br />ESTIMATED MINE INFLOW <br />JACOB- LOHMAN METHOD <br />• ti <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />15 <br />20 <br />0 <br />No. 5 Mine <br />2 -West <br />Seepage Fault <br />gpm gpm <br />580 <br />600 <br />620 <br />620 <br />620 <br />620 <br />620 <br />620 <br />620 <br />620 <br />620 <br />620 <br />THEIM METHOD <br />Init. No. 6 Mine <br />Devel. Under No.5 North of <br />Plus Panel 1 Mine No. 5 Mine <br />gpm gpm gpm <br />360 <br />No. 5 <br />Seepage <br />gpm <br />Mine <br />2 -West <br />Fault <br />gpm <br />Init. <br />Devel. <br />Plus Panel I <br />gpm <br />No. 6 Mine <br />Under No.5 <br />Mine <br />gpm <br />North of <br />No. 5 Mine <br />gpm <br />Total <br />gpm <br />1 <br />390 <br />360 <br />26 <br />- <br />360 <br />780 <br />2 <br />390 <br />360 <br />32 <br />- <br />- <br />780 <br />3 <br />380 <br />360 <br />32 <br />79 <br />- <br />850 <br />4 <br />380 <br />360 <br />32 <br />79 <br />- <br />950 <br />5 <br />370 <br />360 <br />30 <br />98 <br />- <br />860 <br />6 <br />360 <br />360 <br />29 <br />94 <br />490 <br />1330 <br />7 <br />350 <br />360 <br />28 <br />91 <br />560 <br />1390 <br />8 <br />340 <br />360 <br />26 <br />90 <br />560 <br />1380 <br />9 <br />330 <br />360 <br />26 <br />89 <br />560 <br />1360 <br />10 <br />330 <br />360 <br />25 <br />87 <br />550 <br />1350 <br />11 <br />300 <br />360 <br />23 <br />72 <br />620 <br />1380 <br />12 <br />290 <br />360 <br />21 <br />64 <br />540 <br />1280 <br />• ti <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />15 <br />20 <br />0 <br />No. 5 Mine <br />2 -West <br />Seepage Fault <br />gpm gpm <br />580 <br />600 <br />620 <br />620 <br />620 <br />620 <br />620 <br />620 <br />620 <br />620 <br />620 <br />620 <br />THEIM METHOD <br />Init. No. 6 Mine <br />Devel. Under No.5 North of <br />Plus Panel 1 Mine No. 5 Mine <br />gpm gpm gpm <br />360 <br />17 <br />- <br />- <br />360 <br />22 <br />- <br />- <br />360 <br />26 <br />43 <br />- <br />360 <br />26 <br />51 <br />- <br />360 <br />26 <br />65 <br />- <br />360 <br />26 <br />70 <br />280 <br />360 <br />26 <br />75 <br />370 <br />360 <br />26 <br />79 <br />410 <br />360 <br />26 <br />83 <br />440 <br />360 <br />26 <br />87 <br />480 <br />360 <br />26 <br />87 <br />680 <br />360 <br />26 <br />87 <br />700 <br />Total <br />gpm <br />960 <br />980 <br />1010 <br />1060 <br />1070 <br />1360 <br />1450 <br />1500 <br />1529 <br />1573 <br />1780 <br />1800 <br />NOTES: 1) Year 1 for the No. 6 Mine is equivalent to 1987 <br />2) Year 1 for the No. 6 Mine is equivalent to Year 16 <br />for the No. 5 Mine <br />