Laserfiche WebLink
Table 59 <br />TOPSOIL REPLACEMENT <br />NO. 5A PORTAL AND GENERAL AREA *, OLD SHOP, AND CARPENTER SHOP <br />Topsoil Stockpiles Topsoil to be Replaced <br />Location CY Stored Area Acreage Depth <br />5A Portal <br />0 <br />5A Portal 22.0 <br />(1) <br />0 <br />Ponds 5A -P2 &3 4.5 <br />(1) <br />Adjacent to SH -P1 <br />180* <br />Old Shop and 9.0 <br />(2) <br />Adjacent to SH -P2 <br />240* <br />Temporary Office <br />(2) <br />Temporary Office <br />39 <br />(3) <br />NOTES <br />* General Area includes all the disturbed area including sediment control systems. <br />Highlighted values reflect soil materials which have been removed from stockpile and replaced on reclaimed <br />areas <br />1) Overburden will be used as a plant growth media as per the requirements established during the overburden <br />testing. <br />2) The salvaged topsoil will be redistributed over the pond areas, and overburden will be used as the plant <br />growth media for the remainder of the site. <br />3) The topsoil was salvaged from the eastern end of the parking lot and will be redistributed to a depth of 6" over <br />this area. The existing soils will be used as a plant growth media for the remainder of the area. <br />Any overburden or soil materials to be used will be sampled for fertility and amendments added, as indicated and <br />appropriate. <br />TR14 -36 2.05.3 -47 Revised 09/08/14 <br />