Laserfiche WebLink
Twentymile Mine railroad spur. The 6RT Thickener Underflow Borehole extends approximately 540 feet from the <br />surface into the sealed EMD mine workings. An existing light -use road extends approximately 250 feet from RCR33 <br />to this location. The 7RT Thickener Underflow Borehole installation will be located east of both the intersection of <br />Routt County Roads 27 (RCR27) and 33 (RCR33) and the 6RT Borehole, on the north side of Foidel Creek and the <br />Twentymile Mine railroad spur. The 7RT Thickener Underflow Borehole will extend approximately 850 feet from <br />the surface into the sealed EMD mine workings. The 2MN Thickener Underflow Borehole installation will be located <br />near the north edge of the existing Mine Facilities Area, between the existing Weld Shop and the Twentymile Railroad <br />Spur and will be accessed by a short (550 feet) access road from the existing mine road. The 2MN Thickener <br />Underflow Borehole will extend approximately 150 feet from the surface into the existing active 2MN No. 6 Mine <br />Entry. From this location, the coal slurry will be piped underground approximately 2,650 feet and 3,850 feet, <br />respectively, to horizontal boreholes into the sealed 7 -Right and 8 -Right Panels in the Eastern Mining District (EMD). <br />An additional thickener underflow borehole was added in the WMD in 2017. The 12 -Left Thickener Underflow <br />Borehole is located off RCR27 just east of the intersection with County Road 37 on the north side of the road. The <br />borehole will extend into the WMD mine workings approximately 1,260 feet in the 12 Left Irby Panel. In 2018 four <br />additional borehole locations were proposed and permitted in the WMD in panels 14, 15, 16, and 17. All four <br />locations are along County Road 27 with 14 -Left and 15 -Left on the East side and 16 -Left and 17 -Left on the west <br />side, all are within 700 feet of County Road 27. All boreholes will be drilled into the inby panel of their associated <br />panel, the depths are 1,370 feet, 1381 feet, 1408 feet, and 1405 feet respectively. <br />Three additional thickener underflow boreholes will be added in the SWMD in 2016 and 2017. The SWMD <br />Thickener Underflow Borehole will be located near the Fish Creek Borehole road where it joins RCR27. Two <br />alternate borehole locations have been identified, only one of which will be initially constructed and developed. The <br />first location 1 (in Panel 2SW) is located on the west side of RCR27 between the west mine entrance and the Fish <br />Creek Borehole road, and has been selected for construction. The second location (in Panel 1SW) is located on the <br />east side of RCR27 and will be accessed from the Fish Creek Borehole road this location was an alternative and will <br />not be constructed at this time but may be a potential site in the future. The SWMD Thickener Underflow Borehole in <br />2SW will extend from the surface into the sealed SWMD mine workings a maximum of approximately 750 feet. TC <br />also plans a test borehole (Sandstone Sub Test Borehole) to evaluate conditions in the 3SW Gateroad (WMD) for a <br />future thickener underflow borehole. The test hole will be located on the existing Sandstone Substation pad, and will <br />be directionally drilled to intersect the 3SW Gateroad at a depth of approximately 420 -feet. If conditions in this area <br />are favorable, TC will convert the test borehole to a thickener underflow borehole, which will involve boring the test <br />hole out to 22 to 24 inches for the surface casing and 12 to 15 inches for the finished borehole, setting and <br />cementing a 16 to 18 inch surface casing to a depth of approximately 60 feet, setting and cementing a 8 to 11 inch <br />borehole casing to a depth of approximately 420 feet, and setting an 8 -foot covered CMP manhole with lightening <br />protection in-place to protect the well -head. The third borehole will extend approximately 1,060 feet into the 1SW <br />Panel, at a location north of the sandstone cliffs adjacent to the Twentymile Facilities in the SWMD. This borehole <br />will be accessed from the existing ranch road which is used to access the Union Cellular tower from the Fish Creek <br />Road. Minor road improvements to provide for year-round access will include limited grading, placement of water - <br />bars and minor work on the existing ditches, and placement of gravel surfacing materials. <br />In order for the thickener underflow to reach the 1 SW and the 12, 14, 15, 16, & 17 -Left thickener underflow <br />boreholes, a pump boost station was installed at the 2SW borehole pad location. The pump boost station will consist <br />of a one -foot thick, 20 x 20 foot concrete pad, a pre -fabricated pump building, the booster pump and piping <br />connections, and a drop -line from a nearby power -pole with electrical connections and pump controls. <br />At each of these locations (except the Sandstone Sub location, where a pad already exists), a drill -pad and required <br />drainage structures were or will be constructed. Buried thickener underflow pipelines have been or will be installed <br />between the existing washplant facilities and the thickener underflow boreholes. The locations of the thickener <br />underflow boreholes and the associated pipelines are shown on the Surface Facilities and Freshwater Systems Map, <br />Map 24 (1/4). Design information for the thickener underflow boreholes and pipelines is provided in Exhibits 49K and <br />49S. <br />Installation of the thickener underflow boreholes generally involves placement of construction erosion controls (silt <br />fence and/or straw wattles), removal and windrowing of available soil materials from pad areas and the road <br />margins, construction of designed drainage structures (ditches and rock sumps), grading to establish level drill -pads <br />TR18-90 2.05-84.6 04/05/18 <br />