Laserfiche WebLink
storage facilities and were not specifically designed or constructed as impoundments, the applicable requirements of Rule <br /> 4.05.9 are addressed in this context by the following descriptions and the referenced existing configuration drawings: <br /> Area 1 Pit Temporary Water Storage Basin(TR05-47)—The Area 1 Pit is a remnant surface mine pit adjacent to the Run- <br /> of-Mine Coal Stockpile), as shown on Map 24, Surface Facilities, and by Figure EX8v-1 in Exhibit 8V. Impoundment <br /> design, operation, maintenance, and reclamation information is provided in Exhibit 8v. The remnant pit area is a totally <br /> incised excavation, enclosed by undisturbed natural ground and backfilled surface mine spoils, with an estimated <br /> maximum water storage capacity of approximately 200 acre-feet. The pit area is used for temporary storage of excess <br /> mine water, as part of the closed-loop mine dewatering and recycle system. Water inputs to the pit are limited to spoil <br /> spring discharge from the adjacent reclaimed spoils areas, excess dewatering flows from the mine dewatering systems, <br /> and minor incident precipitation. An upgradient diversion ditch(Ditch D-3) intercepts any surface runoff from upgradient <br /> reclaimed surface mine areas and routes it around the Area 1 Pit to Pond D. While a small culvert outlet at the low point <br /> on the crest of the pit allows for minor discharge flow to Pond D if the water reaches this level, the temporary storage <br /> basin is normally managed to keep water levels well below the discharge pipe. A fixed pumping station is used to control <br /> water level, with discharge to a de-sander, located at an old well site, and then to Washplant I or the mine water recycling <br /> system, or directly to Pond D for discharge to Foidel Creek. Management of the Area 1 Pit storage basin involves regular <br /> inspection and maintenance of water levels and pumping systems, and reduction of water levels prior to spring discharge <br /> to provide additional water storage capacity for any minor increases in subsequent spoil spring discharge. <br /> With implementation of operations for Washplant II, the Area 1 Pit is also utilized as the primary source for plant make- <br /> up water. An additional pump will be placed in the Area 1 Pit and connected to the new 8-inch water-line. Either a float or <br /> submersible pump will be utilized, with pump control and access from the existing pump-station access in the Area 1 Pit. A <br /> manhole with manual valves or automated control valves will be used to control flow to the Washplant. In order to address <br /> increased mine dewatering requirements, transfer pipelines from the Fish Creek and IORT dewatering boreholes have been <br /> established,with discharge directly to the Area 1 Pit. <br /> Washplant I Thickener Overflow Sump (TR05-47, Superseded by TR07-59, Washplant II) —The Washplant 1 Thickener <br /> Overflow Sump, located adjacent to the Thickener Tank in the Washplant I area, as shown on Map 24, Surface Facilities, <br /> and by Figure EX8w-1 in Exhibit 8w was excavated during Washplant construction to serve as a catch basin for the <br /> contents of the Thickener, if required for maintenance or under upset conditions. Impoundment design, operation, <br /> maintenance, and reclamation information is provided in Exhibit 8w. While it has not been necessary to utilize the basin <br /> for this purpose, it is occasionally used to collect and retain minor quantities of Washplant wash-down water. As an <br /> incised and closed basin (ie: no outlet) the only inputs are thickener overflow, wash-down water from the Washplant, or <br /> minor incident precipitation, which are subsequently pumped back into the system by a portable floating pump <br /> installation. Water level in the sump is monitored and managed as part of the ongoing plant operations. <br /> Washplant II Thickener Overflow Sump (TR07-59, Washplant II) — For discussion of Washplant 11 Thickener Overflow <br /> Sump please refer to previous discussion under Rule 2.05.3(3), Mine Facilities. <br /> FCB Treatment Facility(Revised-MR07-216) <br /> Three treatment cells were constructed for treating mine discharge water from the Fish Creek Borehole. The cells location <br /> and cross-sections are shown on Maps 26 and 32, Fish Creek Borehole Area Facilities, and Access Road, and Fish Creek <br /> Settling Pond Plan View and Cross Sections. The design for the culverts for the Fish Creek Borehole Access Road is <br /> presented in Exhibit 8R. <br /> The facility originally consisted of two adjacent dewatering wells. A water treatment system consisting of three treatment <br /> cells, chemical feed stations (sodium hydroxide and sulfuric acid), a substation, access road and powerlines, was <br /> subsequently added. The facility was modified in 2006, to replace the sodium hydroxide treatment system with an <br /> electro-coagulation unit. In 2007, the inactive Fish Creek Ventilation Shaft was converted to a dewatering installation to <br /> replace the inoperable Fish Creek South Dewatering Borehole. The water supply pumps are set within the dewatering <br /> wells immediately above the top of the coal seam in sealed mine workings in the Western Mining District. Electricity is <br /> supplied by the powerlines shown on Map 39, Powerline Location. Each <br /> TR18-91 2.05-79 08/20/18 <br />