Laserfiche WebLink
- -I' 01- . m2(, 110(-4 <br /> COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br /> f 1313 Sherman Street,Room 215'Denver'Colorado 80203 ph(303)866-3567 <br /> Yj816� <br /> REQUEST FOR TECHNICAL REVISION(FR)COVER SHEET <br /> File No.:M- 2011-014 <br /> Site Name:Schmidt Site <br /> County Archuleta TR# (DRAIS Use only) <br /> P .Dale & Ellen Schmidt RECEW`© <br /> Operator(If Other than Permittee):Non e <br /> NOV 08 2018 <br /> Permittee Representative:Nathan A Barton Division of Fecfornvf , <br /> Mining,&Safety <br /> Please provide a brief description of the proposed revision: <br /> To provide additional and changed information as required by the enforcement action,to inckide information on storm water <br /> - •K"• .i 1 -4• .- •, I ,n - 0.1 - P • • `1, 0..1ed 1.1 , - r:1 , .I h • -, 1,1 .ill} • •} • ; 1 . I <br /> compliance with regulations_Please see attadnnents_ <br /> As defined by the Minerals Rules,a Technical Revision(TR)is:"a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee,the Division will <br /> determine if it is approvable within 30 days.If the Division requires additional information to approve a <br /> TR,you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies,the Division must deny the TR unless the <br /> permittee requests additional time,in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR;however,it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request,including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type-Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted(mark only one) <br /> 110c, 111, 112 construction ❑ <br /> materials,and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 ❑ <br /> 110d, 112d(1,2 or 3) $1006 ❑ <br />