Laserfiche WebLink
Table 1 - Daily Subsidence Data <br />Subsidence Monitoring Wolf Creek 8 East LW Cross Panel Axis 1 29 10/17/2018 <br />WC 8 East Panel - Cross Axis 1 <br />Subsidence Monitoring Wolf Creek 8 East LW UPRR Energy Spur.xls <br />*Note: There is a macro that will perform these calcs for you. Ctr+t will activate it. <br />DATE: <br />6/26/18 <br />The initial points must be entered starting with the date in cell A11. The new points should be copied to the New Survey Tab. <br />STATION: <br />119+30 <br />March 17, 2018 - Baseline data - Prior to the start of the 8 East LW <br />PANEL: <br />8 East LW <br />DELTA DELTA DELTA CUM. CUM. cum. cum. <br />DATE <br />PT. ID. 8 East LW <br />NORTH <br />EAST ELEV. NORTH EAST ELEV. NORTH EAST ELEV. (Ft.) ELEV. (In.) Location <br />Subsidence Monitoring Wolf Creek 8 East LW Cross Panel Axis 1 29 10/17/2018 <br />