Laserfiche WebLink
Table 1 - Daily Subsidence Data <br />WC 8 East Panel - Cross Axis 1 Subsidence Monitoring Wolf Creek 8 East LW UPRR Energy Spur.xls <br />*Note: There is a macro that will perform these calcs for you. Ctr+t will activate it. <br />DATE: 6/26/18 The n tia points must be entered starting with the date in cell At 1. The new points should be copied to the New Survey Tab. <br />STATION: 119+30 March 17, 2018 - Baseline data - Prior to the start of the 8 East LW <br />PANEL: 8 East LW <br />DELTA I DELTA DELTA CUM. CUM. CUM. CUM. <br />DATE PT. ID. 8 East LW NORTH EAST ELEV. NORTH I EAST ELEV. I NORTH I EAST I ELEV. (Ft .l ELEV. lln.l Location <br />Subsidence Monitoring Wolf Creek 8 East LW Cross Panel Axis 1 18 10/17/2018 <br />